Staffing needs and utilization for alternative contracting methods in highway design and construction

被引:4
|
作者
Tran, Dai Q. [1 ]
Harper, Christofer M. [2 ]
Smadi, Adi M. [1 ]
Mohamed, Mamdouh [1 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[2] Colorado State Univ, Construct Management, Ft Collins, CO 80523 USA
关键词
Project delivery methods; Alternative contracts; Staffing; Highways; The United States; PROJECT DELIVERY; PROCUREMENT; SELECTION;
D O I
10.1108/ECAM-07-2019-0342
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This research investigates procedures and effective practices on staffing needs and utilization for successful implementation of alternative contracting methods (ACMs) in the United Sates, including design-build (D-B) and construction manager/general contractor (CM/GC) delivery methods. Design/methodology/approach The review of published empirical studies, a national survey of transportation agencies and case studies of highway agencies form the basis of the conclusions in this research. In addition to the national survey, with 46 of 50 agencies participating, the research presents case studies from five highway agencies in the United States including the following: California, Florida, Georgia, Minnesota and Virginia. These five case studies were selected from agencies that have extensive experience in delivering ACM projects. The case studies involved a thorough procedural review and structured interviews of agency personnel. The agencies then validated the results and conclusions. Findings The results showed that implementing ACM projects requires different knowledge, skills and management and coordination efforts than traditional design-bid-build (D-B-B) projects. The study found that the key success factors of implementing ACMs are the following: (1) establishment of an ACM champion; (2) active involvement of key staff throughout the ACM project development process; (3) appropriate use of consultants and (4) ACM training and staff development. Originality/value This research is the first attempt to examine the staffing needs and utilization for ACM projects.
引用
收藏
页码:2163 / 2178
页数:16
相关论文
共 50 条
  • [1] The Use and Performance of Alternative Contracting Methods on Small Highway Construction Projects
    Alleman, Douglas
    Antoine, Arthur
    Schrilla, Mia
    Molenaar, Keith
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 908 - 915
  • [2] Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran
    Noorzai, Esmatullah
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2020, 26 (02)
  • [3] Approach for Estimating Inspection Staffing Needs for Highway Construction Projects
    Mohamed, Mamdouh
    Tran, Dai Q. Q.
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (06) : 697 - 707
  • [4] TIME IS MONEY - INNOVATIVE CONTRACTING METHODS IN HIGHWAY CONSTRUCTION
    HERBSMAN, ZJ
    CHEN, WT
    EPSTEIN, WC
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03): : 273 - 281
  • [5] Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
    Zhu, Yimin
    Ahmad, Irtishad
    Wang, Li
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (07): : 601 - 608
  • [6] Industry Attitudes toward Alternative Contracting for Highway Construction in Florida
    Chini, Abdol
    Ptschelinzew, Lourdes
    Minchin, R. Edward, Jr.
    Zhang, Yuanxin
    Shah, Dev
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)
  • [7] Time is money: Innovative contracting methods in highway construction - Closure
    Herbsman, ZJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (01): : 99 - 99
  • [8] Performance of seven highway construction contracting methods analyzed by project size
    Yuanxin ZHANG
    Abdol CHINI
    REdward MINCHIN Jr
    Lourdes PTSCHELINZEW
    Dev SHAHRinker
    Frontiers of Engineering Management, 2018, 5 (02) : 240 - 250
  • [9] Performance of seven highway construction contracting methods analyzed by project size
    Zhang, Yuanxin
    Chini, Abdol
    Minchin, R. Edward, Jr.
    Ptschelinzew, Lourdes
    Shah, Dev
    FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (02) : 240 - 250
  • [10] Performance of seven highway construction contracting methods analyzed by project size
    Yuanxin ZHANG
    Abdol CHINI
    R.Edward MINCHIN Jr.
    Lourdes PTSCHELINZEW
    Dev SHAHRinker
    Frontiers of Engineering Management, 2018, (02) : 240 - 250