Train scheduling of Shinkansen and relationship to reliable train operation

被引:0
|
作者
Sone, S. [1 ]
Zhongping, Y. [1 ]
机构
[1] Beijing Jiaotong Univ, Beijing, Peoples R China
关键词
disturbance; punctuality; reliable operation; spare time; train scheduling;
D O I
10.2495/CR100131
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper explains why security is important, especially in Asia, as well as safety, and how we established reliable transportation in the Japanese Shinkansen, mainly in relation to train scheduling. The authors also describe several ideas actually taken by Shinkansen in order to realise reliable operation even in the case of possible disturbances. Out of many ideas, some examples of which are shown here, selective adoption according to the purpose of the railway or line is strongly recommended, together with given conditions taken into account.
引用
收藏
页码:133 / 139
页数:7
相关论文
共 50 条
  • [31] GNSS Based Train Localization for Automatic Train Operation
    Stadlmann, Burkhard
    Mandl, Sebastian
    2017 15TH INTERNATIONAL CONFERENCE ON ITS TELECOMMUNICATIONS (ITST), 2017,
  • [32] Shinkansen: From bullet train to symbol of modern Japan.
    Siebert, Loren
    PACIFIC AFFAIRS, 2007, 80 (01) : 112 - 114
  • [33] Joint scheduling and train operation simulator for rescheduled time table evaluation
    Yang, Pengxin
    Cui, Dongliang
    Dai, Xuewu
    Yue, Peng
    Liu, Ruiguang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (11): : 3454 - 3463
  • [34] Train Shunting Operation Scheduling with Number of Wagon Moves Oriented Optimization
    Zhang B.
    Peng Q.
    Li L.
    Lu G.
    Tiedao Xuebao/Journal of the China Railway Society, 2020, 42 (03): : 11 - 20
  • [35] DEVELOPMENT OF AN AUTOMATIC TRAIN COUPLING AND DECOUPLING SYSTEM FOR SHINKANSEN.
    Ito, Jun ichi
    Japanese Railway Engineering, 1987, 27 (03): : 20 - 23
  • [36] Maintenance of electrical facilities of Shinkansen utilizing multipurpose inspection train
    Fujita, Fumio
    Japanese Railway Engineering, 1995, (132-133): : 11 - 17
  • [38] Tackling on speedup of Shinkansen with a test train named `WIN 350'
    Yagi, Eiji, 1600, Publ by Japan Railway Engineers' Assoc, Tokyo, Japan : 128 - 129
  • [39] Adhesion Increase Method for Shinkansen Train under Snowfall in Winter
    Saga S.
    Chen H.
    Matsuno J.
    Quarterly Report of RTRI (Railway Technical Research Institute), 2024, 65 (01) : 9 - 15
  • [40] From timetabling to train regulation - a new train operation model
    Chang, SC
    Chung, YC
    INFORMATION AND SOFTWARE TECHNOLOGY, 2005, 47 (09) : 575 - 585