Future plans for e+e- factories

被引:1
作者
Biscari, C [1 ]
机构
[1] INFN, LNF, Frascati, Italy
来源
PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5 | 2003年
关键词
D O I
10.1109/PAC.2003.1288916
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
In the last decade luminosities of lepton colliders have greatly risen. There are several ingredients of the success: the progress in the handling of high currents and multibunch regimes, in the beam-beam interaction limits understanding, in particle dynamics simulation codes, in the diagnostic systems to control beam sizes and orbits, in the background shielding. Now is time to go further in the high luminosity frontiers: experiments are asking for more precision measurements, and the accelerator community is facing projects where the increase of luminosity by orders of magnitude is conceivable. New ideas, main upgrades and plans in the factories presently in operation around the world are the subject of this paper.
引用
收藏
页码:335 / 339
页数:5
相关论文
共 14 条
[1]  
Bossi F, 1999, EUR PHYS J C, V6, P109
[2]  
CAI Y, P PAC 2001 CHIC, P3564
[3]  
CURCEANU C, 2003, 41 INT WINT M NUCL P
[4]  
Ohnishi Y., COMMUNICATION
[5]  
OLSEN S, 2002, ICFA SEM CERN OCT
[6]  
Raimondi P., 2003, G58 DAFNE
[7]  
RICE D, 2002, P EPAC02 C
[8]  
ROUDEAU P, 2001, P LEPT PHOT 01 ROM I, P119
[9]  
SEEMAN JI, COMMUNICATION
[10]  
SHATUNOV Y, 2002, P EPAC02 C PAR