Optimal level schedules for mixed-model, multi-level just-in-time assembly systems

被引:27
作者
Kubiak, W
Steiner, G
Yeomans, JS
机构
[1] MEM UNIV NEWFOUNDLAND, FAC BUSINESS ADM, St John, NF A1B 3X5, CANADA
[2] MCMASTER UNIV, DEGROOTE SCH BUSINESS, MANAGEMENT SCI & INFORMAT SYST AREA, HAMILTON, ON L8S 4M4, CANADA
[3] YORK UNIV, MANAGEMENT SCI AREA, SCHULICH SCH BUSINESS, N YORK, ON M3J 1P3, CANADA
关键词
D O I
10.1023/A:1018985029260
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Solving the level (or balanced) schedule problem is the most important scheduling goal for just-in-time production assembly systems. No previous methods have been presented for determining optimal balanced schedules in multi-level facilities. In this paper, it is shown that the multi-level, min-max problem is NP-hard in the strong sense. A dynamic programming algorithm (DP) is developed for both the min-max and min-sum problems which, for the first time, permits optimal schedules to be determined for large, multi-level problems. The time and space requirements of the DP are analyzed and several techniques for reducing the DP's computational requirements are described. A filtering scheme is proposed to eliminate dominated solutions from a problem's potentially vast state space. Extensive computational testing of the min-max algorithm is reported and the conclusions from this testing are presented.
引用
收藏
页码:241 / 259
页数:19
相关论文
共 19 条
[1]  
Garey M. R., 1979, Computers and intractability. A guide to the theory of NP-completeness
[2]  
GOLDSTEIN T, 1988, 294 MCMAST U FAC BUS
[3]   FINAL ASSEMBLY SEQUENCING FOR JUST-IN-TIME MANUFACTURING [J].
GROEFLIN, H ;
LUSS, H ;
ROSENWEIN, MB ;
WAHLS, ET .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (02) :199-213
[4]  
Hall R.W., 1983, ZERO INVENTORIES
[5]   NEEDED - AN EMPIRICAL SCIENCE OF ALGORITHMS [J].
HOOKER, JN .
OPERATIONS RESEARCH, 1994, 42 (02) :201-212
[6]   SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES [J].
INMAN, RR ;
BULFIN, RL .
MANAGEMENT SCIENCE, 1991, 37 (07) :901-904
[7]  
KENNEDY WJ, 1980, STATISTICAL COMPUTIN
[8]   LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
KUBIAK, W ;
SETHI, S .
MANAGEMENT SCIENCE, 1991, 37 (01) :121-122
[9]   MINIMIZING VARIATION OF PRODUCTION-RATES IN JUST-IN-TIME SYSTEMS - A SURVEY [J].
KUBIAK, W .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 66 (03) :259-271
[10]  
Kubiak W., 1994, International Journal of Flexible Manufacturing Systems, V6, P137, DOI 10.1007/BF01328809