Study on observation system of seismic forward prospecting in tunnel: A case on tailrace tunnel of Wudongde hydropower station

被引:1
|
作者
Yang, Senlin [1 ]
Cao, Hongyi [2 ]
Zhang, Yi [3 ]
Chen, Lei [1 ]
Xu, Xinji [1 ]
Song, Jie [4 ]
Xu, Lei [5 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Peoples R China
[2] Shandong Univ, Control Sci & Engn, Jinan 250061, Peoples R China
[3] Shandong Univ, Sch Qilu Transportat, Jinan 250061, Peoples R China
[4] Shandong Prov Commun Planning & Design Inst, Jinan 250061, Peoples R China
[5] Changjiang Geophys Explorat & Testing Co Ltd WUHA, Wuhan 430010, Peoples R China
来源
OPEN GEOSCIENCES | 2022年 / 14卷 / 01期
关键词
Seismology - Data handling - Hydroelectric power - Numerical models - Hydroelectric power plants - Tunnels - Geology;
D O I
10.1515/geo-2020-0268
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Seismic method is a major approach for detecting the seismic geological features ahead of the tunnel, understanding the distribution of unfavorable geology, and ensuring the safety of tunnel construction. Observation system is the key for seismic detection, many studies have been conducted to optimize the observation system; however, most of them focused on the surface seismic investigation and numerical simulation rather than in tunnel field environment (limited aperture and full space environment). How to obtain better wavefield information with limited observation aperture is a great challenge. In this study numerical simulation and instrumental techniques (GPR, DC, etc.) were implemented to further check the result of seismic detection at the 1# tailrace tunnel at the Wudongde hydropower station. In the field case, observation detectors were arranged spatially in the tunnel and source points were placed in four ways: linearly along a single side, on the tunnel face, in front of the detectors, and behind the detectors. Then, after data acquisition, the data processing is conducted to carry out the migration results. The imaging results indicate that the observation system with sources and detectors in liner arrangement (with equal interval) helps to suppress artifacts, further supporting the advantages of spatial observation system with liner observation line (detectors). Moreover, the study provides suggestions for geological prospecting in similar tunnel projects.
引用
收藏
页码:1 / 12
页数:12
相关论文
共 50 条
  • [2] An improved model and the thermodynamic calculation method for tailrace tunnel ventilating system in hydropower station
    Yu, Yanshun
    Zhang, Shaofan
    Li, Xianting
    ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (08) : 2060 - 2066
  • [3] Characteristics of heat and moisture transfer of tailrace tunnel ventilation in hydropower station
    Yu, Yan-Shun
    Li, Xian-Ting
    Shi, Wen-Xing
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2009, 33 (05): : 600 - 606
  • [4] A case study of seismic forward prospecting based on the tunnel seismic while drilling and active seismic methods
    Xu, Xinji
    Zhang, Panlong
    Guo, Xu
    Liu, Bin
    Chen, Lei
    Zhang, Qingsong
    Nie, Lichao
    Zhang, Yi
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (05) : 3553 - 3567
  • [5] A case study of seismic forward prospecting based on the tunnel seismic while drilling and active seismic methods
    Xinji Xu
    Panlong Zhang
    Xu Guo
    Bin Liu
    Lei Chen
    Qingsong Zhang
    Lichao Nie
    Yi Zhang
    Bulletin of Engineering Geology and the Environment, 2021, 80 : 3553 - 3567
  • [6] Experimental Investigation on Air-Water Interaction in a Hydropower Station Combining a Diversion Tunnel with a Tailrace Tunnel
    Zhang, Wen
    Cai, Fulin
    Zhou, Jianxu
    Hua, Yulong
    WATER, 2017, 9 (04)
  • [7] Research on stability of slope at right inlet diversion tunnel of Wudongde Hydropower Station
    Wang, J.-L. (39128518@qq.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (43):
  • [8] A simplified model of heat and moisture transfer for tailrace tunnel ventilating in hydropower station
    Yu, Yanshun
    Li, Xianting
    Shi, Wenxing
    APPLIED THERMAL ENGINEERING, 2009, 29 (14-15) : 3254 - 3260
  • [9] Development and Validation of Mathematical Model for Tailrace Tunnel Ventilating Process in Hydropower Station
    Yu, Yanshun
    Qian, Puhua
    Zhang, Shaofan
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4069 - 4073
  • [10] Prediction model of heat and moisture transfer of tailrace tunnel ventilation in hydropower station
    Yu, Yan-Shun
    Li, Xian-Ting
    Shi, Wen-Xing
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2008, 32 (01): : 73 - 77