共 50 条
- [1] Study on the configuration of hydropower station tailrace tunnel with sloping ceiling Shuili Xuebao, 3 (9-12, 21):
- [3] Characteristics of heat and moisture transfer of tailrace tunnel ventilation in hydropower station Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2009, 33 (05): : 600 - 606
- [5] A case study of seismic forward prospecting based on the tunnel seismic while drilling and active seismic methods Bulletin of Engineering Geology and the Environment, 2021, 80 : 3553 - 3567
- [7] Research on stability of slope at right inlet diversion tunnel of Wudongde Hydropower Station Wang, J.-L. (39128518@qq.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (43):
- [9] Development and Validation of Mathematical Model for Tailrace Tunnel Ventilating Process in Hydropower Station FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4069 - 4073
- [10] Prediction model of heat and moisture transfer of tailrace tunnel ventilation in hydropower station Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2008, 32 (01): : 73 - 77