Faster than an urban stream: Evaluating morphodynamics in urban channel reaches that have undergone form-based channel enhancement

被引:5
作者
Padovan, Patrick [1 ,3 ]
Cockburn, Jaclyn [1 ]
Villard, Paul [2 ]
机构
[1] Univ Guelph, Dept Geog Environm & Geomat, 50 Stone Rd West, Guelph, ON N1G 2W1, Canada
[2] GEO Morphix Ltd, 36 Main St North, Campbellville, ON L0P 1B0, Canada
[3] GEO Morphix Ltd, 36 Main St North, Campbellville, ON L0P 1B0, Canada
关键词
Urban stream restoration; Channel forming flow; Sediment supply; Rapid stream assessments; RESTORATION PROJECTS; RIVER; GEOMORPHOLOGY; OPPORTUNITIES; CHALLENGES; EVOLUTION; CAPACITY; DYNAMICS;
D O I
10.1016/j.geomorph.2022.108288
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Urban streams are frequently the focus of channel enhancement efforts due to extensive degradation, failing infrastructure and land use change caused by urban development. Following construction, short-term monitoring is a standard step in evaluating channel stability and amelioration success. However, monitoring activities rarely fully capture adjustment mechanisms, as geomorphic adjustment can take several years to observe and characterize. This study assessed the performance and adjustment processes observed within six form-based channel enhancements projects, in a heavily urbanized area along Highland Creek, Toronto, Ontario, Canada. Bankfull flow conditions occurred multiple times in a single season as a function of reduced stormwater retention in the basin and as such the beds and banks experience high shear stresses. Rapid geomorphic assessments were conducted along the enhanced reaches, and over 200 design features (e.g., pools, riffles, rock weirs) were surveyed to analyze stability and evaluate design feature conditions following the various channel enhancement projects that have occurred. Stability indices for each reach indicate that most of the enhanced reaches showed signs of on-going adjustment 15-years post-construction, with features along banks and within grade control structures showing the most change. For example, the observed change through this system in a short period of time demonstrates that urban streams are changing at rates faster than streams in areas with less urban land use. This study informs mid- to long term stability assessment and furthers our understanding of active adjustment processes following construction in challenging urban landscapes.
引用
收藏
页数:11
相关论文
共 51 条
  • [1] ESTIMATING CHANNEL-FORMING DISCHARGE IN URBAN WATERCOURSES
    Annable, W. K.
    Lounder, V. G.
    Watson, C. C.
    [J]. RIVER RESEARCH AND APPLICATIONS, 2011, 27 (06) : 738 - 753
  • [2] ANNABLE W.K., 1996, DATABASE MORPHOLOGIC, P212
  • [3] [Anonymous], 2010, CANADIAN CLIMATE NOR
  • [4] Aquafor Beech Ltd, 2006, HIGHL CREEK EM WORKS
  • [5] Ashmore P., 2001, Geological Survey of Canada Bulletin, V555, P58, DOI [10.4095/211891, DOI 10.4095/211891]
  • [6] Process-based Principles for Restoring River Ecosystems
    Beechie, Timothy J.
    Sear, David A.
    Olden, Julian D.
    Pess, George R.
    Buffington, John M.
    Moir, Hamish
    Roni, Philip
    Pollock, Michael M.
    [J]. BIOSCIENCE, 2010, 60 (03) : 209 - 222
  • [7] Restoring Rivers in the Twenty-First Century: Science Challenges in a Management Context
    Beechie, Timothy J.
    Pess, George R.
    Pollock, Michael N.
    Ruckelshaus, Mary H.
    Roni, Phil
    [J]. FUTURE OF FISHERIES SCIENCE IN NORTH AMERICA, 2009, 31 : 697 - +
  • [8] Restoring streams in an urbanizing world
    Bernhardt, Emily S.
    Palmer, Margaret A.
    [J]. FRESHWATER BIOLOGY, 2007, 52 (04) : 738 - 751
  • [9] THE USE OF STREAM POWER AS AN INDICATOR OF CHANNEL SENSITIVITY TO EROSION AND DEPOSITION PROCESSES
    Bizzi, S.
    Lerner, D. N.
    [J]. RIVER RESEARCH AND APPLICATIONS, 2015, 31 (01) : 16 - 27
  • [10] Evolution of Ontario's Stormwater Management Planning and Design guidance
    Bradford, A
    Gharabaghi, B
    [J]. WATER QUALITY RESEARCH JOURNAL OF CANADA, 2004, 39 (04): : 343 - 355