共 50 条
- [41] Closed Loop Feedback Mechanism Effect Pilot Investigation on Manual Assembly Time and Process Variation 48TH SME NORTH AMERICAN MANUFACTURING RESEARCH CONFERENCE, NAMRC 48, 2020, 48 : 95 - 104
- [43] Automatic digitalization and performance assessment of manual assembly processes using a marker-less motion tracking approach The International Journal of Advanced Manufacturing Technology, 2023, 129 : 5101 - 5115
- [45] The learning curve to ROSA: cases needed to match the surgery time between a robotic-assisted and a manual primary total knee arthroplasty European Journal of Orthopaedic Surgery & Traumatology, 2023, 33 : 3357 - 3363
- [48] Risks Prediction and Processes Optimization for Complex Systems on the Base of Probabilistic Modeling PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, SIMULATION AND MODELLING, 2016, 41 : 186 - 192
- [50] Time optimization of the textile manufacturing process using the stochastic processes INDUSTRIA TEXTILA, 2016, 67 (03): : 205 - 209