共 43 条
Hoist Scheduling for Multi-Part CHSP in Complex Lines' Configuration
被引:0
|作者:
El Amraoui, A.
[1
,2
]
Manier, M-A
[1
]
El Moudni, A.
[1
]
Benrejeb, M.
[2
]
机构:
[1] UTBM, Lab Syst & Transports, Belfort, France
[2] ENIT, U R LARA Automat, Tunis, Tunisia
来源:
2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT)
|
2011年
关键词:
SINGLE HOIST;
ELECTROPLATING LINES;
ALGORITHM;
D O I:
暂无
中图分类号:
TP3 [计算技术、计算机技术];
学科分类号:
0812 ;
摘要:
The performance of an enterprise largely depends on the schedule of its resources. A good schedule may increase the output rate and reduce the production costs. Therefore, in this paper, we consider the cyclic schedule of hoist activities in automated electroplating lines which is commonly known as Cyclic Hoist Scheduling Problem (CHSP). The CHSPs appear in the manufacturing facilities to achieve a mass production and to search a repetitive sequence of moves for the hoist. In such kind of lines, hoist is used for moving electroplates through a line of tanks containing chemical baths. In this paper, we extend our elaborated 2-degree cyclic linear model to a more complex configuration of the production lines.
引用
收藏
页数:6
相关论文