2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT)
|
2011年
关键词:
SINGLE HOIST;
ELECTROPLATING LINES;
ALGORITHM;
D O I:
暂无
中图分类号:
TP3 [计算技术、计算机技术];
学科分类号:
0812 ;
摘要:
The performance of an enterprise largely depends on the schedule of its resources. A good schedule may increase the output rate and reduce the production costs. Therefore, in this paper, we consider the cyclic schedule of hoist activities in automated electroplating lines which is commonly known as Cyclic Hoist Scheduling Problem (CHSP). The CHSPs appear in the manufacturing facilities to achieve a mass production and to search a repetitive sequence of moves for the hoist. In such kind of lines, hoist is used for moving electroplates through a line of tanks containing chemical baths. In this paper, we extend our elaborated 2-degree cyclic linear model to a more complex configuration of the production lines.
机构:
Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
Univ Paris Saciay, Cent Supelec, Lab Genie Ind, 3 Rue Joliot Curie, F-91190 Gif Sur Yvette, FranceNorthwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
Feng, Jianguang
Chu, Chengbin
论文数: 0引用数: 0
h-index: 0
机构:
Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
Univ Paris Est, ESIEE Paris, 2 Blvd Blaise Pascal,Cite Descartes BP 99, F-93162 Noisy Le Grand, FranceNorthwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
Chu, Chengbin
Che, Ada
论文数: 0引用数: 0
h-index: 0
机构:
Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R ChinaNorthwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China