Hoist Scheduling for Multi-Part CHSP in Complex Lines' Configuration

被引:0
|
作者
El Amraoui, A. [1 ,2 ]
Manier, M-A [1 ]
El Moudni, A. [1 ]
Benrejeb, M. [2 ]
机构
[1] UTBM, Lab Syst & Transports, Belfort, France
[2] ENIT, U R LARA Automat, Tunis, Tunisia
来源
2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT) | 2011年
关键词
SINGLE HOIST; ELECTROPLATING LINES; ALGORITHM;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The performance of an enterprise largely depends on the schedule of its resources. A good schedule may increase the output rate and reduce the production costs. Therefore, in this paper, we consider the cyclic schedule of hoist activities in automated electroplating lines which is commonly known as Cyclic Hoist Scheduling Problem (CHSP). The CHSPs appear in the manufacturing facilities to achieve a mass production and to search a repetitive sequence of moves for the hoist. In such kind of lines, hoist is used for moving electroplates through a line of tanks containing chemical baths. In this paper, we extend our elaborated 2-degree cyclic linear model to a more complex configuration of the production lines.
引用
收藏
页数:6
相关论文
共 43 条
  • [1] Resolution of the two-part cyclic hoist scheduling problem with bounded processing times in complex lines' configuration
    El Amraoui, Adnen
    Manier, Marie-Ange
    El Moudni, Abdellah
    Benrejeb, Mohamed
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (04) : 454 - 473
  • [2] Online Set Packing and Competitive Scheduling of Multi-Part Tasks
    Emek, Yuval
    Halldorsson, Magnus M.
    Mansour, Yishay
    Patt-Shamir, Boaz
    Radhakrishnan, Jaikumar
    Rawitz, Dror
    PODC 2010: PROCEEDINGS OF THE 2010 ACM SYMPOSIUM ON PRINCIPLES OF DISTRIBUTED COMPUTING, 2010, : 440 - 449
  • [3] Dynamic hoist scheduling for multi-recipe and multi-stage production lines: A logical framework
    Ramin, Danial
    Fraizzoli, Damiano
    Ballarino, Andrea
    Brusaferri, Alessandro
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 182
  • [4] A heuristic scheduling procedure for multi-item hoist production lines
    Paul, Henrik J.
    Bierwirth, Christian
    Kopfer, Herbert
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (01) : 54 - 69
  • [5] Multi-degree cyclic hoist scheduling with time window constraints
    Che, Ada
    Zhou, Zhen
    Chu, Chengbin
    Chen, Haoxun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (19) : 5679 - 5693
  • [6] Cyclic multi-hoist scheduling with fuzzy processing times in flexible manufacturing lines
    Ptuskin, Alexander
    Levner, Eugene
    Kats, Vladimir
    APPLIED SOFT COMPUTING, 2024, 165
  • [7] Cyclic hoist scheduling in large real-life electroplating lines
    Ada Che
    Chengbin Chu
    OR Spectrum, 2007, 29 : 445 - 470
  • [8] Cyclic hoist scheduling in large real-life electroplating lines
    Che, Ada
    Chu, Chengbin
    OR SPECTRUM, 2007, 29 (03) : 445 - 470
  • [9] A new method of cyclic hoist scheduling for multi-recipe and multi-stage material handling processes
    Qu, Honglin
    Wang, Sujing
    Xu, Qiang
    COMPUTERS & CHEMICAL ENGINEERING, 2016, 90 : 171 - 187
  • [10] A polynomial algorithm for no-wait cyclic multi-hoist scheduling
    Che, Ada
    Chu, Chengbin
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1156 - 1161