Intra-Interval Security Based Dispatch for Power Systems With High Wind Penetration

被引:18
作者
Che, Liang [1 ,2 ]
Liu, Xuan [3 ]
Zhu, Xin [3 ]
Wen, Yunfeng [3 ]
Li, Zuyi [4 ]
机构
[1] Midcontinent Independent Syst Operator Inc, Carmel, IN 46032 USA
[2] Hunan Univ, Dept Elect & Informat Engn, Changsha 410000, Hunan, Peoples R China
[3] Hunan Univ, Coll Elect & Informat Engn, Changsha 410082, Hunan, Peoples R China
[4] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
基金
国家重点研发计划;
关键词
Intermittent resource; preventive dispatch; real-time operation; wind variability; wind uncertainty; VULNERABILITY; UNCERTAINTY; RESERVES; IMPACTS;
D O I
10.1109/TPWRS.2018.2870667
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Security-constrained economic dispatch is executed based on consecutive dispatch intervals in real time. The short-term variations of wind power can cause the system to enter an unsecured operating region inside a dispatch interval, which is referred to as the intra-interval security (IIS) problem in this paper. IIS may not be addressed by existing dispatch methods as the traditional dispatch is to ensure the security at the interval end. This can lead to IIS risks in an interval when a high-wind-penetrated system encounters large intra-interval variations (IIVs) of wind power. To address this issue, an IIS preventive dispatch approach is proposed in this study. This approach models the wind power IIVs and develops a preventive dispatch to ensure the IIS over the interval in terms of line overloads while taking into account the tradeoff between security and economics. The proposed approach is implemented in a linear-programming model whose global optimum can be efficiently obtained by adding Benders-like cuts. Case study on the IEEE 118-bus system proves that a high level of nonlinear IIVs can cause the IIS issue (inside of an interval) even with accurate wind forecasts at both interval ends. The simulations show that some lines can have severe overloads inside the dispatch interval in spite of having flows below their capacity limits at both interval ends, and demonstrate that the proposed approach can mitigate such intra-interval overloads even under the worst case IIV scenario.
引用
收藏
页码:1243 / 1255
页数:13
相关论文
共 35 条
  • [1] [Anonymous], 2018, ASOS MAINPAGE DOWNLO
  • [2] [Anonymous], BPM 002 EN OP RES MA
  • [3] [Anonymous], 2012, 2011 NE BLACKOUT REP
  • [4] [Anonymous], 2017, ERCOT reaches 50% wind penetration mark
  • [5] [Anonymous], 2015, WIND POWER DENMARK
  • [6] [Anonymous], 2005, TOP0070 NERC
  • [7] [Anonymous], 2003, 2003 NE BLACKOUT REP
  • [8] Bilevel programming applied to power system vulnerability analysis under multiple contingencies
    Arroyo, J. M.
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2010, 4 (02) : 178 - 190
  • [9] Impacts of Wind Power Uncertainty on Grid Vulnerability to Cascading Overload Failures
    Athari, Mir Hadi
    Wang, Zhifang
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2018, 9 (01) : 128 - 137
  • [10] Adequacy Evaluation of Distribution System Including Wind/Solar DG During Different Modes of Operation
    Atwa, Y. M.
    El-Saadany, E. F.
    Salama, M. M. A.
    Seethapathy, R.
    Assam, M.
    Conti, S.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (04) : 1945 - 1952