A Two-Stage Solution to the Bi-Objective Optimal Voltage Regulation Problem

被引:18
作者
Kryonidis, Georgios C. [1 ]
Demoulias, Charis S. [1 ]
Papagiannis, Grigoris K. [1 ]
机构
[1] Aristotle Univ Thessaloniki, Sch Elect & Comp Engn, GR-54124 Thessaloniki, Greece
基金
欧盟地平线“2020”;
关键词
Optimization; Voltage control; Reactive power; Energy loss; Real-time systems; Minimization; On load tap changers; Distributed generation; energy loss minimization; on-load tap changer; reactive power control; voltage control; REACTIVE POWER; DISTRIBUTION NETWORKS; COORDINATED CONTROL; OPTIMIZATION; DISPATCH; SYSTEMS; OPF;
D O I
10.1109/TSTE.2019.2914063
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper, a two-stage approach is introduced to efficiently solve the optimal voltage regulation problem in radial medium-voltage (MV) distribution networks. The proposed method uses the available reactive power of distributed generation units and the on-load tap changer (OLTC) of the high-voltage/MV transformer to regulate network voltages, while also minimizing two conflicting objectives, namely the network energy losses and the frequency of tap changes. This bi-objective optimal voltage regulation problem is addressed in two distinct stages. In the first stage, the network is linearized and a simplified optimal voltage regulation problem is solved to determine the candidate OLTC operating plans (COOPs). For each COOP, a new reactive power allocation method is employed in the second stage to regulate the network voltages and minimize network losses. This method follows a rule-based approach, also allowing its implementation under real-field conditions. The final outcome of this two-stage process is the Pareto-front which can be used by the distribution system operators to select the most preferable solution for the real-time network operation. The proposed methodology is characterized by reduced computational complexity compared to the application of conventional optimization techniques. Time-domain and time-series simulations on a radial MV distribution network are employed to thoroughly evaluate the performance of the proposed method.
引用
收藏
页码:928 / 937
页数:10
相关论文
共 50 条
[41]   An Efficient Robust Solution to the Two-Stage Stochastic Unit Commitment Problem [J].
Blanco, Ignacio ;
Morales, Juan M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (06) :4477-4488
[42]   The vehicle routing and scheduling problem with cross-docking for perishable products under uncertainty: Two robust bi-objective models [J].
Rahbari, Ali ;
Nasiri, Mohammad Mahdi ;
Werner, Frank ;
Musavi, MirMohammad ;
Jolai, Fariborz .
APPLIED MATHEMATICAL MODELLING, 2019, 70 :605-625
[43]   A two-phase Pareto local search heuristic for the bi-objective pollution-routing problem [J].
Costa, Luciano ;
Lust, Thibaut ;
Kramer, Raphael ;
Subramanian, Anand .
NETWORKS, 2018, 72 (03) :311-336
[44]   Solving Bi-Objective Quadratic Assignment Problem with Squirrel Search Algorithm [J].
Ningtiyas, Sri Wahyuni ;
Pratiwi, Asri Bekti ;
Damayanti, Auli .
INTERNATIONAL CONFERENCE ON MATHEMATICS, COMPUTATIONAL SCIENCES AND STATISTICS 2020, 2021, 2329
[45]   A Bi-Objective Lane Reservation Problem Considering Dynamic Traffic Flow [J].
Li, Tao ;
Wang, Nengmin ;
Jiang, Bin ;
Zhang, Meng .
IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2023, 24 (01) :367-381
[46]   A bi-objective turning restriction design problem in urban road networks [J].
Long, Jiancheng ;
Szeto, W. Y. ;
Huang, Hai-Jun .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (02) :426-439
[47]   A Tabu Search Method for a Bi-Objective Urban Waste Collection Problem [J].
Ruben Gomez, Jose ;
Pacheco, Joaquin ;
Gonzalo-Orden, Hernan .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2015, 30 (01) :36-53
[48]   A bi-objective model for the used oil location-routing problem [J].
Zhao, Jiahong ;
Verter, Vedat .
COMPUTERS & OPERATIONS RESEARCH, 2015, 62 :157-168
[49]   WEIGHTED ITERATION ALGORITHM FOR SOLVING BI-OBJECTIVE LINEAR PROGRAMMING PROBLEM [J].
Wang, Shuoqi ;
Wang, Zhanzhong .
INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2024, 20 (03) :755-770
[50]   A simheuristic for bi-objective stochastic permutation flow shop scheduling problem [J].
Maria Gonzalez-Neira, Eliana ;
Rafael Montoya-Torres, Jairo .
JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) :57-80