Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality

被引:55
作者
Arashpour, Mehrdad [1 ]
Heidarpour, Amin [1 ]
Nezhad, Ali [2 ]
Hosseinifard, Zahra [3 ]
Chileshe, Nicholas [4 ]
Hosseini, Reza [5 ]
机构
[1] Monash Univ, Dept Civil Engn, Wellington Rd, Melbourne, Vic 3800, Australia
[2] Univ Sydney, Sch Civil Engn, Sydney, NSW, Australia
[3] Univ Melbourne, Dept Management & Mkt, Melbourne, Vic, Australia
[4] Univ South Australia, Sch Nat & Built Environm, Adelaide, SA, Australia
[5] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
关键词
Advanced manufacturing; construction project management; decision support systems; gaming behaviour; hypothesis testing; SUPPLY CHAIN; ON-SITE; PRODUCTION FLOW; CONSTRUCTION; DESIGN; BIM; MANAGEMENT; PROJECT; PREFABRICATION; SYSTEM;
D O I
10.1080/01446193.2019.1616789
中图分类号
F [经济];
学科分类号
02 ;
摘要
Defects and quality problems in off-site manufacturing of building parts are caused by different variables. Subsequently, rework is required during on-site subassembly aggregation. Rework and tampering with prefabricated parts has implications including suboptimal structural/non-structural performance, delays and increased costs. Currently there is a gap in the off-site construction literature in developing effective interventions to reflect on variability in operations of subassembly manufacturers. On this basis, and in the first step of the current research, point clouds of the as-built status of parts are generated by laser scanners and compared with the as-designed status represented by Building Information models (BIM). Then, optimization modelling is used for development of a balanced penalty and incentive (PI) scheme to minimize variability. For this purpose, total expenditure on variability reduction is offset by revenues generated from penalties on poor quality. This optimization-based research contributes to the off-site construction literature by providing cost-effective solutions to quality problems. Furthermore, models and findings are of practical importance to off-site manufacturers by encouraging precision and discouraging discrepancy.
引用
收藏
页码:502 / 514
页数:13
相关论文
共 107 条
  • [1] Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID
    Altaf, Mohammed Sadiq
    Bouferguene, Ahmed
    Liu, Hexu
    Al-Hussein, Mohamed
    Yu, Haitao
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 85 : 369 - 383
  • [2] [Anonymous], 2004, OPERATIONS RESEARCHA
  • [3] [Anonymous], 2015, 20 INT C ENG DES ICE
  • [4] Optimization modeling modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction
    Arashpour, Mehrdad
    Kamat, Vineet
    Bai, Yu
    Wakefield, Ron
    Abbasi, Babak
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 95 : 1 - 9
  • [5] Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources
    Arashpour, Mehrdad
    Wakefield, Ron
    Abbasi, Babak
    Arashpour, Mohammadreza
    Hosseini, Reza
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2018, 14 (1-2) : 46 - 59
  • [6] Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting
    Arashpour, Mehrdad
    Abbasi, Babak
    Arashpour, Mohammadreza
    Hosseini, M. Reza
    Yang, Rebecca
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (04) : 647 - 655
  • [7] Off-site construction optimization: Sequencing multiple job classes with time constraints
    Arashpour, Mehrdad
    Wakefield, Ron
    Abbasi, Babak
    Lee, E. W. M.
    Minas, James
    [J]. AUTOMATION IN CONSTRUCTION, 2016, 71 : 262 - 270
  • [8] Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Lee, E. W. M.
    Chan, Ricky
    Hosseini, M. Reza
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) : 1393 - 1402
  • [9] Quantitative Analysis of Rate-Driven and Due Date-Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Abbasi, Babak
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
  • [10] Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, E. W. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (02)