Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates

被引:27
作者
Altendorfer, Klaus [1 ]
Minner, Stefan [2 ]
机构
[1] Upper Austria Univ Appl Sci, Dept Operat Management, Sch Management, A-4400 Steyr, Austria
[2] Univ Vienna, Dept Business Adm, A-1210 Vienna, Austria
关键词
Manufacturing; Queuing; Inventory; Investment analysis; ADVANCE DEMAND INFORMATION; SERIAL PRODUCTION SYSTEMS; MAKE-TO-STOCK; ORDER INFORMATION; SERVICE-LEVEL; LEADTIMES; TARDINESS; CONWIP; DESIGN; OPTIMALITY;
D O I
10.1016/j.ejor.2011.03.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a two-stage make-to-order manufacturing system with random demands, processing times, and distributed customer due dates. The work to each stage is released based on a planned lead time. A general approach to minimize total inventory holding and customer order tardiness cost is presented to find the optimal manufacturing capacities and planned lead times for each manufacturing stage. Expressions are derived for work-in process inventories, finished-goods-inventory and expected backorders under the assumption of a series of M/M/1 queuing systems and exponentially distributed customer required lead times. We prove that the distribution of customer required lead time has no influence on the optimal planned lead times whenever capacity is predefined but it influences the optimal capacity to invest into. For the simultaneous optimization of capacity and planned lead times we present a numerical study that shows that only marginal cost decreases can be gained by setting a planned lead time for the upstream stage and that a considerable cost penalty is incurred if capacity and planned lead time optimization are performed sequentially. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:134 / 146
页数:13
相关论文
共 39 条
[1]   An analytical model for service level and tardiness in a single machine MTO production system [J].
Altendorfer, Klaus ;
Jodlbauer, Herbert .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (07) :1827-1850
[2]   Simultaneous capacity and production management of short-life-cycle, produce-to-stock goods under stochastic demand [J].
Angelus, A ;
Porteus, EL .
MANAGEMENT SCIENCE, 2002, 48 (03) :399-413
[3]   Planning order releases for an assembly system with random operation times [J].
Axsäter, S .
OR SPECTRUM, 2005, 27 (2-3) :459-470
[4]   Managing capacity and inventory jointly in manufacturing systems [J].
Bradley, JR ;
Glynn, PW .
MANAGEMENT SCIENCE, 2002, 48 (02) :273-288
[5]   ON A CONGESTION PROBLEM IN AN AIRCRAFT FACTORY [J].
BRIGHAM, G .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF AMERICA, 1955, 3 (04) :412-428
[6]   SOME INEQUALITIES FOR PARALLEL-SERVER QUEUES [J].
BRUMELLE, SL .
OPERATIONS RESEARCH, 1971, 19 (02) :402-&
[7]  
Buzacott J. A., 1992, Queueing Systems Theory and Applications, V12, P135, DOI 10.1007/BF01158638
[8]   SAFETY STOCK VERSUS SAFETY TIME IN MRP CONTROLLED PRODUCTION SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
MANAGEMENT SCIENCE, 1994, 40 (12) :1678-1689
[9]   Several results on the design of queueing systems [J].
Chao, XL ;
Scott, C .
OPERATIONS RESEARCH, 2000, 48 (06) :965-970
[10]   CLASSIFIED BIBLIOGRAPHY OF RESEARCH ON OPTIMAL DESIGN AND CONTROL OF QUEUES [J].
CRABILL, TB ;
GROSS, D ;
MAGAZINE, MJ .
OPERATIONS RESEARCH, 1977, 25 (02) :219-232