A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead Time

被引:3
作者
Slama, Ilhem [1 ]
Ben-Ammar, Oussama [2 ]
Dolgui, Alexandre [1 ]
Masmoudi, Faouzi [3 ]
机构
[1] CNRS, LS2N, IMT Atlantique, 4 Rue Alfred Kastler,BP 20722, F-44307 Nantes, France
[2] Univ Clermont Auvergne, Dept Mfg Sci & Logist, Mines St Etienne, CNRS,UMR 6158,LIMOS CMP, Gardanne, France
[3] Univ Sfax, Lab Mech Modeling & Prod LA2MP, Engn Sch Sfax, Sfax, Tunisia
来源
ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO DIGITAL TRANSFORMATION AND INNOVATION OF PRODUCTION MANAGEMENT SYSTEMS, PT I | 2020年 / 591卷
关键词
Disassembly lot-sizing; Random lead time; Stochastic programming; Monte Carlo simulation; YIELD;
D O I
10.1007/978-3-030-57993-7_32
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The purpose of this research is to propose an optimization method for the stochastic disassembly lot-sizing problem under uncertainty of lead time. One type of end-of-life (EoL) product is disassembled to satisfy a dynamic and known demand of items over a planning horizon. The tactical problem is considered as a random optimization problem in order to minimize the expected total cost. A sample average approximation (SAA) approach, is developed to model the studied random optimization problem and minimize the average total cost. The effectiveness of the solution approach has successfully tested and proved.
引用
收藏
页码:275 / 283
页数:9
相关论文
共 10 条
  • [1] Reverse MRP under uncertain and imprecise demand
    Barba-Gutierrez, Y.
    Adenso-Diaz, B.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (3-4) : 413 - 424
  • [2] Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    Ilgin, Mehmet Ali
    Gupta, Surendra M.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2010, 91 (03) : 563 - 591
  • [3] Heuristics for solving disassemble-to-order problems with stochastic yields
    Inderfurth, K
    Langella, IM
    [J]. OR SPECTRUM, 2006, 28 (01) : 73 - 99
  • [4] How yield process misspecification affects the solution of disassemble-to-order problems
    Inderfurth, Karl
    Vogelgesang, Stephanie
    Langella, Ian M.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 169 : 56 - 67
  • [5] Capacitated disassembly scheduling with random demand
    Kim, Hwa-Joong
    Xirouchakis, Paul
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (23) : 7177 - 7194
  • [6] A stochastic model for operating room planning with elective and emergency demand for surgery
    Lamiri, Mehdi
    Xie, Xiaolan
    Dolgui, Alexandre
    Grimaud, Frederic
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (03) : 1026 - 1037
  • [7] Capacitated disassembly scheduling under stochastic yield and demand
    Liu, Kanglin
    Zhang, Zhi-Hai
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 269 (01) : 244 - 257
  • [8] Ruszczynski A, 2003, HDBK OPER R, V10, P1
  • [9] Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead time
    Slama, I.
    Ben-Ammar, O.
    Masmoudi, F.
    Dolgui, A.
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 595 - 600
  • [10] Slama I., 2020, ROADEF