Fault Analysis of The Distance Protection Overreach Caused by The Power Transmission Lines Ring Closing with A Wrong Phase Sequence

被引:0
作者
He, He [1 ]
Wang, Hongbin [1 ]
Huang, Ruiling [1 ]
机构
[1] State Grid Chongqing Elect Power CO, Elect Power Res Inst, Chongqing, Peoples R China
来源
2021 3RD ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM (AEEES 2021) | 2021年
关键词
transmission lines; ring closing; distance protection; overreach;
D O I
10.1109/AEEES51875.2021.9403171
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A power transmission lines ring closing with a wrong phase sequence occurred in a regional power grid, which led to an overreach of the line distance protection. Through theoretical analysis, it is found that when the lines ring closing is operated with a wrong phase sequence, the protection shows the similar electrical characteristics as the phase-to-phase short circuit, and there is an equivalent phase-to-phase fault point in the system, which is the midpoint of all equivalent impedances between the power supply on both sides. As a result, the equivalent measured impedance may fall into the action range of the distance protection somewhere, which will lead to the exceeding of distance protection. The actual fault data also confirm the analysis conclusion.