Metro construction safety risk assessment based on the fuzzy AHP and the comprehensive evaluation method

被引:7
作者
Zheng, Xin [1 ]
Ma, Fenghai [1 ]
机构
[1] Dalian Univ, Coll Civil & Architectural Engn, Dalian 116622, Peoples R China
来源
ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV | 2014年 / 580-583卷
关键词
Subway construction; Risk management; Risk assessment;
D O I
10.4028/www.scientific.net/AMM.580-583.1243
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Facing with a variety of risks in the process of the metro construction, the metro construction needs to carry on the risk management. The risk assessment is the main link of the metro project risk management also the foundation of the decision analysis. This paper introduces the basic concept of the subway risk management, as a case study of Changchun No. 1 subway construction risk assessment using the fuzzy AHP and the comprehensive evaluation method. The results show that Changchun subway station work sites exist many risk factors and the risk level difference is big. The major attention should be paid to the geological risks, the environment risks and the construction technical risks, while the environment risks and the construction technical risks are the focus of the risk analysis.
引用
收藏
页码:1243 / 1248
页数:6
相关论文
共 6 条
[1]  
Guo Xunjie, 2012, LIAONING U ENG TECHN, V31, P300
[2]  
Li Xiaohao, 2010, ENG MANAGEMENT J, V24, P513
[3]  
Lu Youjie, 1988, PROJECT RISK MANAGEM
[4]  
Wang Jing, 2009, UNDERGROUND SPACE EN, V5, P385
[5]  
Xie J., 2006, FUZZY MATH METHODS I
[6]  
Zhu Shengli, 2008, Urban Rapid Rail Transit, V21, P56