共 50 条
- [32] SIMULATION AND ANALYSIS OF CONSTRUCTION COURSE OF HIGH ROCK MASS SLOPE IN THE COKEOVEN PLANT OF MAGANG COMPANY RECENT DEVELOPMENT OF GEOTECHNICAL AND GEO-ENVIRONMENTAL ENGINEERING IN ASIA, PROCEEDINGS, 2006, : 303 - +
- [33] Coupling Real-time Control of Construction Safety and Progress of Roller Compacted Concrete Dam During the Construction Period FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1454 - 1458
- [36] Simulation and Dynamic Visualization of Flow and Sediment Motion Downstream of Cuijiaying Dam Journal of Hydrodynamics, 2006, 18 : 492 - 498