Hierarchical Risk Assessment of Transmission System Considering the Influence of Active Distribution Network

被引:63
作者
Jia, Hongjie [1 ]
Qi, Wenjin [1 ]
Liu, Zhe [1 ]
Wang, Bingdong [1 ]
Zeng, Yuan [1 ]
Xu, Tao [1 ]
机构
[1] Tianjin Univ, Key Lab Smart Grid, Minist Educ, Tianjin 300072, Peoples R China
基金
英国工程与自然科学研究理事会; 美国国家科学基金会;
关键词
Active distribution network; available supply capacity; distributed generation; risk assessment; GENERATION SYSTEMS; POWER;
D O I
10.1109/TPWRS.2014.2360851
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In traditional distribution system, power flow was unidirectional; thus loads were usually aggregated into the substation as an equivalent constant bus in the original risk analysis of transmission system. Detail structures of the distribution system were absolutely ignored. However, distribution system is transformed from passive to active nowadays with more and more distributed generations (DGs) being integrated into it. So, distribution system not only can be considered as loads but also can be considered as virtual power plants to supply power to local loads and even to send power back to the transmission system sometimes. In this paper, a hierarchical method is presented to evaluate the impact of role changing of the distribution system in power system risk assessment. In the study, DGs can supply critical loads in distribution system through re-dispatching after some contingency happens. Discrete probability model is employed to simulate the intermittent output of DGs. Available supply capacity (ASC) is used as a general constraint to guarantee the security level of distribution system that needs high reliability. Also, an iterative calculation between transmission system and distribution network is adopted to derive the risk indices with considering detail structures of the active distribution network. Further, impact of some factors on system risk calculation, such as DGs' capacities, dispersions, locations, and component outage probabilities, are discussed. Finally, correctness and effectiveness of the proposed method are validated by a modified IEEE RTS and RBTS system.
引用
收藏
页码:1084 / 1093
页数:10
相关论文
共 29 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]  
[Anonymous], POWERTECH 2009 IEEE
[3]  
[Anonymous], 2005, Risk Assessment Of Power Systems: Models, Methods, and Applications
[4]   Deregulated power system planning using a reliability network equivalent technique [J].
Billinton, R ;
Wang, P .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1999, 146 (01) :25-30
[5]  
Billinton R, 1996, IEEE T POWER SYST, V11, P1670, DOI 10.1109/59.544626
[6]  
Celli G, 2012, IEEE POW ENER SOC GE
[7]  
Celli G., 2011, 2011 IEEE TRONDHEIM, P1
[8]  
D'Adamo C., 2009, Electra, P22
[9]  
D'Adamo C., 2009, CIRED 2009 20 INT C, P1
[10]   Power system operation risk assessment using credibility theory [J].
Feng, Yongqing ;
Wu, Wenchuan ;
Zhang, Boming ;
Li, Wenyuan .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :1309-1318