摘要
This paper describes the study made to assess the electrical stresses imposed on line circuit breakers of a new 500kV, AC expansion of the FURNAS transmission system, to be possibly installed in the Brazilian central region. The study has considered three configurations of the transmission lines, two of which assuming the use of compact towers. In one of these two cases the lines would have high surge-impedance loading. Digital simulations have been made with the aid of the Alternative Transients Program (ATP) to calculate the switching transients appearing as a result of line energization and reclosing, clearing of terminal and short-line faults, no-load line opening in normal and faulted conditions, and out-of phase switching. Four alternatives have been considered for the limitation of overvoltages on closing, assuming either the sole use of surge arresters on each line end or the use, in addition to the arresters, of pre-insertion resistors, synchronizers or time relays to provide a staggered closing of the breaker poles. The stresses obtained were compared with those applied by the standard IEC tests or with the maximum admissible levels usually considered by the utility for its transmission branches at the planning stage.
引用
收藏
页码:169 / 175
页数:7
相关论文
共 50 条
  • [1] DEVELOPMENT OF A 500KV AIRBLAST HVDC CIRCUIT-BREAKER
    BACHMANN, B
    MAUTHE, G
    RUOSS, E
    LIPS, HP
    PORTER, J
    VITHAYATHIL, J
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1985, 104 (09): : 2460 - 2466
  • [2] Design of 1100 kV GIS circuit-breaker
    Hyosung Corporation, 641-712 Nae-dong Changwon, Kyoungnam, Korea, Republic of
    Gaoya Dianqi, 2007, 3 (189-191+193): : 189 - 191
  • [3] NEW CIRCUIT-BREAKER FOR 800 kV.
    Mueller, Bruno
    Troger, Helmut
    Siemens power engineering, 1981, 3 (Spec Issue): : 42 - 45
  • [4] PROTECTION REQUIREMENTS INFLUENCE CIRCUIT-BREAKER DESIGN
    ROBBINS, JA
    ELECTRICAL REVIEW, 1973, 192 (19): : 675 - &
  • [5] CIRCUIT BREAKER REQUIREMENTS FOR FURNAS-CENTRAIS ELETRICAS, SA 500KV SYSTEM
    HEDMAN, DE
    MOUNTFOR.JD
    PEIXOTO, CA
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1973, PA92 (06): : 1804 - 1804
  • [6] CIRCUIT-BREAKER PERFORMANCE REQUIREMENTS FOR HIGHER-VOLTAGE SYSTEMS
    BOLTON, E
    JOURNAL OF SCIENCE AND TECHNOLOGY, 1971, 38 (04): : 142 - &
  • [7] ALTERNATIVE CIRCUIT-BREAKER PROGRAMS - ANALYSIS OF SIZE AND DISTRIBUTION OF BENEFITS
    SCHROEDER, LD
    SJOQUIST, DL
    PUBLIC FINANCE QUARTERLY, 1978, 6 (04): : 395 - 413
  • [8] SIMULATIONS ON INTERRUPTION OF CIRCUIT-BREAKER IN HVDC SYSTEM WITH 2 PARALLEL TRANSMISSION-LINES
    TOKUYAMA, S
    HIRASAWA, K
    YOSHIOKA, Y
    KATO, Y
    IEEE TRANSACTIONS ON POWER DELIVERY, 1987, 2 (03) : 772 - 778
  • [9] SYNTHETIC TESTING OF AC CIRCUIT BREAKERS .2. REQUIREMENTS FOR CIRCUIT-BREAKER PROVING
    ANDERSON, JG
    ELLIS, NS
    HICK, MAS
    MASON, FO
    ORTON, LH
    REECE, MP
    STEEL, JG
    PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1968, 115 (07): : 996 - &
  • [10] PHASE-PHASE SWITCHING SURGES ON 500-KV TRANSFORMER-TERMINATED LINES .1. 500-KV CIRCUIT-BREAKER OPERATION
    WILSON, DD
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (05): : 685 - &