Techno-economic analysis and Monte Carlo simulation for green hydrogen production using offshore wind power plant

被引:133
作者
Jang, Dohyung [1 ]
Kim, Kilwon [2 ]
Kim, Kyong-Hwan [2 ]
Kang, Sanggyu [1 ]
机构
[1] Seoul Natl Univ, Dept Naval Architecture & Ocean Engn, 1 Gwanak Ro, Seoul 08826, South Korea
[2] Korea Res Inst Ship & Ocean Engn, Ocean Plant Res Div, Daejeon 34103, South Korea
基金
新加坡国家研究基金会;
关键词
Hydrogen production; Offshore wind power plant; Economic evaluation; Levelized cost of hydrogen; Sensitivity analysis; Monte Carlo simulation method; ECONOMIC-EVALUATION; ELECTROLYSIS; ENERGY; STORAGE; COST;
D O I
10.1016/j.enconman.2022.115695
中图分类号
O414.1 [热力学];
学科分类号
摘要
With the growth of marine energy such as offshore wind power, hydrogen is a promising solution for the intermittence of renewable energy sources and long-distance transmission. Some demonstration projects of offshore hydrogen production are underway using wind power. However, comparative studies on novel options such as individual hydrogen production and transport to land from each wind turbine, have not advanced beyond conceptual suggestion. In this study, to determine the most economical method of connecting offshore wind power plants and hydrogen production facilities, a techno-economic analysis of three offshore wind power plant arrangements is presented, including distributed hydrogen production, centralized hydrogen production, and onshore hydrogen production. As a method for feasibility comparison, net present value calculation, sensitivity analysis, and Monte Carlo simulation are suggested and analysis results for three arrangements are presented. In particular, the results of the proton exchange membrane electrolysis system model that is developed in the previous study are applied in order to determine the hydrogen production efficiency. Calculated hydrogen production cost was 13.81, 13.85, 14.58 $/kg(H2) for distributed case, centralized case, and onshore hydrogen production case, respectively. The analysis results show that distributed case has the most competitive case due to the absence of expensive High Voltage Direct Current cable and offshore substation. Sensitivity analysis shows it is necessary to maintain capacity factor.
引用
收藏
页数:13
相关论文
共 43 条
[1]  
Ahn JW, APPL ENERG
[2]  
[Anonymous], 2019, NDCs in 2020: Advancing renewables in the power sector and beyond
[3]  
Bertuccioli L., 2014, Study on development of water electrolysis in the EU
[4]   The use of Monte Carlo method to assess the uncertainty of thermal comfort indices PMV and PPD: Benefits of using a measuring set with an operative temperature probe [J].
Broday, Evandro Eduardo ;
Ruivo, Celestino Rodrigues ;
Silva, Manuel Gameiro da .
JOURNAL OF BUILDING ENGINEERING, 2021, 35
[5]   Hydrogen Production from Offshore Wind Parks: Current Situation and Future Perspectives [J].
Calado, Goncalo ;
Castro, Rui .
APPLIED SCIENCES-BASEL, 2021, 11 (12)
[6]  
Chen T.-P., 2008, Final Report Hydrogen Delivery Infrastructure Options Analysis
[7]   Sustainable Hydrogen Production from Offshore Marine Renewable Farms: Techno-Energetic Insight on Seawater Electrolysis Technologies [J].
d'Amore-Domenech, Rafael ;
Leo, Teresa J. .
ACS SUSTAINABLE CHEMISTRY & ENGINEERING, 2019, 7 (09) :8006-+
[8]  
Edenhofer O, 2011, RENEWABLE ENERGY SOURCES AND CLIMATE CHANGE MITIGATION: SPECIAL REPORT OF THE INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE, P1
[9]   Assessment of offloading pathways for wind-powered offshore hydrogen production: Energy and economic analysis [J].
Franco, Brais Armino ;
Baptista, Patricia ;
Neto, Rui Costa ;
Ganilha, Sofia .
APPLIED ENERGY, 2021, 286
[10]   Economics of converting renewable power to hydrogen [J].
Glenk, Gunther ;
Reichelstein, Stefan .
NATURE ENERGY, 2019, 4 (03) :216-222