Organics and phosphorus removal in circular flow corridor constructed wetland system

被引:9
|
作者
Biswas, Anjishnu [1 ]
Patidar, S. K. [1 ]
机构
[1] Natl Inst Technol Kurukshetra, Dept Civil Engn, Kurukshetra 136119, Haryana, India
关键词
Constructed wetland; Fertilizer plant effluent; Slag iron; Total phosphorus removal; Dissolved oxygen; WASTE-WATER TREATMENT; NITROGEN REMOVAL; TYPHA-LATIFOLIA; PHOSPHATE; ZEOLITE; ADSORPTION; PH; PARAMETERS; AERATION; RELEASE;
D O I
10.1016/j.jwpe.2022.103015
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the present study, the performance of a circular flow constructed wetland (CFCW)1 system was assessed for organics and total phosphorus removal from fertilizer plant effluent. The CFCW system has five media compartments containing gravel, slag iron, and a mixture of sand and zeolite as the media substrates. Synthetic fertilizer wastewater having initial COD 520.98 +/- 8.27 mg/L, was fed to the wetland, maintaining hydraulic loading rate of 6.945 L/m2-h. Typha angustifolia was used as the wetland vegetation. The Phase 1 of the study included three cycles, with influent phosphorus concentrations 10, 20, and 30 mg/L, respectively without step feeding and effluent recirculation. The Phase 2 of the study included two cycles with influent phosphorus concentrations of 20 and 30 mg/L, and application of step feeding and effluent recirculation strategies. The average phosphorus removal efficiencies of the system in three cycles of Phase 1 were 85.16 %, 88 %, and 81.95 %, respectively, along with average COD removal of 87.48 %, 87.65 %, and 86.84 %, respectively. The average phosphorus removal efficiencies of the system in two cycles of Phase 2 were 89.01 % and 90.22 % respectively, along with average COD removal of 91.6 % and 91.23 %, respectively. The step feeding and effluent recirculation strategies have shown satisfactory improvement in organics and total phosphorus removal performance of the CFCW system. However, future long-term studies are recommended involving an unplanted control system, step feeding and effluent recirculation in varying compartments, and varying combination of media substrates for improving the design and performance of the CFCW systems.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Statistical Modeling of Phosphorus Removal in Horizontal Subsurface Constructed Wetland
    Li, Wei
    Cui, Lijuan
    Zhang, Yan
    Zhang, Manyin
    Zhao, Xinsheng
    Wang, Yifei
    WETLANDS, 2014, 34 (03) : 427 - 437
  • [42] Effect of recirculation on nitrogen removal in a hybrid constructed wetland system
    Ayaz, S. C.
    Aktas, O.
    Findik, N.
    Akca, L.
    Kinaci, C.
    ECOLOGICAL ENGINEERING, 2012, 40 : 1 - 5
  • [43] Enhanced phosphorus removal of constructed wetland through plant growth-promoting rhizobacteria (PGPR) addition
    Ji, Mingde
    Zhang, Jian
    Wang, Shuo
    Liang, Shuang
    Hu, Zhen
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (37) : 52124 - 52132
  • [44] Enhancement of rhizocompetence in pathogenic bacteria removal of a constructed wetland system
    Ben Saad, Marwa
    Ben Said, Myriam
    Sanz-Saez, Isabel
    Sanchez, Olga
    Morato, Jordi
    Bousselmi, Latifa
    Ghrabi, Ahmed
    WATER SCIENCE AND TECHNOLOGY, 2019, 79 (02) : 251 - 259
  • [45] Nitrogen Removal in Constructed Wetland Wastewater Treatment System: a Review
    Xu Guanglai
    Huang Shuling
    Yuan Xintian
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ASIAN-EUROPEAN ENVIRONMENTAL TECHNOLOGY AND KNOWLEDGE TRANSFER, 2008, : 335 - 338
  • [46] Nitrogen removal in a subsurface flow constructed wetland planted with Heliconia psittacorum
    Gutierrez-Mosquera, Harry
    Ricardo Pena-Varon, Miguel
    TECNOLOGIA Y CIENCIAS DEL AGUA, 2011, 2 (03): : 49 - 60
  • [47] AN EXPERIMENTAL THREE-STAGE HYBRID CONSTRUCTED WETLAND SYSTEM FOR REMOVAL OF ORGANICS AND NUTRIENTS FROM DOMESTIC WASTEWATER
    Tuncsiper, Bilal
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2009, 8 (01): : 59 - 65
  • [48] Mathematical modelling of nitrogen removal in horizontal subsurface flow constructed wetland
    Mouaouia, Ihsane
    Sawadogo, W. Olivier
    Charkaoui, Abderrahim
    Alaa, Nour Eddine
    ANNALS OF THE UNIVERSITY OF CRAIOVA-MATHEMATICS AND COMPUTER SCIENCE SERIES, 2019, 46 (01): : 41 - 55
  • [49] Design, Operation and Optimization of Constructed Wetland for Removal of Pollutant
    Rahman, Md Ekhlasur
    Bin Halmi, Mohd Izuan Effendi
    Samad, Mohd Yusoff Bin Abd
    Uddin, Md Kamal
    Mahmud, Khairil
    Abd Shukor, Mohd Yunus
    Abdullah, Siti Rozaimah Sheikh
    Shamsuzzaman, S. M.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (22) : 1 - 40
  • [50] Nitrate removal in vertical flow constructed wetland planted with Vetiveria zizanioides: Effect of hydraulic load
    Almeida, Adelaide
    Carvalho, Fatima
    Imaginario, Maria J.
    Castanheira, Ivone
    Prazeres, Ana R.
    Ribeiro, Carlos
    ECOLOGICAL ENGINEERING, 2017, 99 : 535 - 542