Optimization-based planning for the stochastic lot-scheduling problem

被引:32
作者
Sox, CR [1 ]
Muckstadt, JA [1 ]
机构
[1] CORNELL UNIV,ITHACA,NY 14853
基金
美国国家科学基金会;
关键词
D O I
10.1080/07408179708966340
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We describe a finite-horizon stochastic optimization model for the stochastic lot-scheduling problem and procedures for finding near-optimal solutions. Several different products are produced by a single-stage process with significant changeover times and costs, and the demand for these products is random. The deterministic version of this problem, the economic lot-scheduling problem, is the subject of a great deal of research. However, the problem with random demand for the products is commonly found in practice but is not as well researched. The models developed in this paper address the problem of dynamically planning the timing and size of production runs in this kind of production environment. We also report some computational results that indicate the quality of the resulting production schedules.
引用
收藏
页码:349 / 357
页数:9
相关论文
共 18 条
[1]   THE STRATEGIC USE OF CAPACITY SLACK IN THE ECONOMIC LOT SCHEDULING PROBLEM WITH RANDOM DEMAND [J].
BOURLAND, KE ;
YANO, CA .
MANAGEMENT SCIENCE, 1994, 40 (12) :1690-1704
[2]  
BOURLAND KE, 1994, COMP SOLUTION APPROA
[3]   SCHEDULING ECONOMIC LOT SIZE PRODUCTION-RUNS [J].
DAVIS, SG .
MANAGEMENT SCIENCE, 1990, 36 (08) :985-998
[4]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[5]   The stochastic Economic Lot Scheduling Problem: Cyclical base-stock policies with idle times [J].
Federgruen, A ;
Katalan, Z .
MANAGEMENT SCIENCE, 1996, 42 (06) :783-796
[6]   SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY [J].
GALLEGO, G .
MANAGEMENT SCIENCE, 1990, 36 (12) :1579-1592
[7]  
GALLEGO G, 1992, NAV RES LOG, V39, P729, DOI 10.1002/1520-6750(199208)39:5<729::AID-NAV3220390510>3.0.CO
[8]  
2-N
[9]   ECONOMIC LOT SCHEDULING PROBLEM WITH RAW-MATERIAL CONSIDERATIONS [J].
GALLEGO, G ;
JONEJA, D .
OPERATIONS RESEARCH, 1994, 42 (01) :92-101
[10]   MULTIITEM, SINGLE-MACHINE SCHEDULING PROBLEM WITH STOCHASTIC DEMANDS - A COMPARISON OF HEURISTICS [J].
GASCON, A ;
LEACHMAN, RC ;
LEFRANCOIS, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (03) :583-596