Cost Overruns and Formal Risk Assessment Program in US Rail Transit Projects

被引:23
作者
Gao, Nan [1 ]
Touran, Ali [1 ]
机构
[1] Northeastern Univ, Dept Civil & Environm Engn, 400 SN, Boston, MA 02115 USA
关键词
Cost overruns; Federal Transit Administration (FTA) risk assessment program; Rail transit projects; Project size; Project implementation duration; PERFORMANCE;
D O I
10.1061/(ASCE)CO.1943-7862.0001827
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overrun in rail transit projects in the United States is a pervasive and constant phenomenon, yet there has been a lack of rigorous statistical analysis on project costs. This has been partly due to the difficulty of obtaining reliable cost data and the small size of the sample. In addition, the Federal Transit Administration (FTA) has required formal risk assessment on transit projects since 2003. Whether this strategy has improved the accuracy of cost estimates is not known. To fill these gaps, this study has collected the cost data of 81 US rail transit projects built during the last 40 years, the largest sample of its kind. It is found that the accuracy of cost estimates at the decision-making phase has improved over time. Also, major projects have higher percentage cost overruns than smaller projects. Further, the accuracy of cost estimates decrease as project implementation durations increase. The utilized statistical methods yielded no evidence to suggest that cost overruns differ between projects designed before and after 2003, when the FTA risk assessment program started. However, since project size and implementation duration have increased over time, the positive impact of the FTA risk assessment program can be inferred and acknowledged to some extent. This research can serve as a reference point for studies on the accuracy of conceptual cost estimates and help in budgeting future projects. It can also help in understanding the causes of cost overruns in capital projects.
引用
收藏
页数:11
相关论文
共 44 条
[1]   THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA [J].
Andric, Jelena M. ;
Mahamadu, Abdul-Majeed ;
Wang, Jiayuan ;
Zou, Patrick X. W. ;
Zhong, Ruoyu .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) :203-214
[2]  
[Anonymous], 131 TRANS COOP RES T
[3]  
[Anonymous], ANN REP FUND REC
[4]  
[Anonymous], CAP INV GRANTS PROGR
[5]  
[Anonymous], 2016, FIN INT POL GUID FED
[6]  
[Anonymous], THESIS
[7]  
[Anonymous], STUD NEW STARTS PROJ
[8]  
[Anonymous], 2003, PRED ACT IMP NEW STA
[9]  
[Anonymous], PROC DEAL OPT BIAS T
[10]  
[Anonymous], FED TRANS ADM COULD