Developing cost response models for company-level cost flow forecasting of project-based corporations

被引:14
作者
Chen, Hong Long [1 ]
机构
[1] I Shou Univ, Dept Ind Engn & Management, Kaohsiung 840, Taiwan
关键词
D O I
10.1061/(ASCE)0742-597X(2007)23:4(171)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The difficulty in applying the standard curve (S-curve) and cost-schedule integration (CSI) techniques for company-level cost flow forecasting in a project-based industry is the prerequisite of forecasting future unknown individual projects and contract classifications. By analyzing cost flows at the company level through a pool of macroeconomic and internal financial data, this paper proposes an innovative approach to firm-specific model estimation. First, a series of data transformations introduce linear relationships between cost, macroeconomic, and internal financial variables. Second, multivariate regression analysis is employed for initial model building. Third, for the purposes of model restructuring, a subsequent application of Yule-Walker estimates and incomplete principal component analysis is used. This paper uses a sample of four project-based construction firms to demonstrate model performance. Using this methodology, mean absolute percentage error (MAPE) values of the forecasting models range from 0.27 to 0.60%. As such, the transformed cost, macroeconomic, internal financial data could strongly predict company-level cost flow forecasting. While converting the predicted cumulative cost data to periodic cost flows, the MAPE values were augmented, ranging from 7.04 to 17.55%, thus, requiring future research.
引用
收藏
页码:171 / 181
页数:11
相关论文
共 33 条
[1]  
ABUDAYYEH OY, 1993, J COMPUT CIVIL ENG, V7, P181, DOI DOI 10.1061/(ASCE)0887-3801(1993)7:2(181)
[2]  
ASHLEY DB, 1977, J CONSTRUCT DIV-ASCE, V103, P369
[3]   Accruals and the prediction of future cash flows [J].
Barth, ME ;
Cram, DP ;
Nelson, KK .
ACCOUNTING REVIEW, 2001, 76 (01) :27-58
[4]  
Belsley D.A., 1980, Regression Diagnosis: Identifying Inuential Data, Source of Collinearity
[5]  
Berny J., 1982, CONSTRUCTION PAPERS, V2, P19
[6]  
Bodie Z., 2002, INVESTMENTS
[7]   COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION [J].
CARR, RI .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (02) :245-265
[8]  
CARR RI, 1991, CONSTRUCTION 21 CENT, P687
[9]   Assessing the accuracy of cash flow models: The significance of payment conditions [J].
Chen, HL ;
O'Brien, WJ ;
Herbsman, ZJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (06) :669-676
[10]   Applying multivariate time series models to technological product sales forecasting [J].
Chiu, YC ;
Shyu, JZ .
INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2004, 27 (2-3) :306-319