Efficient management of production-inventory system in a multi-item manufacturing facility: MTS vs. MTO

被引:10
作者
Gunalay, Yavuz [1 ]
机构
[1] Bahcesehir Univ, Dept Management, FEAS, TR-34353 Istanbul, Turkey
关键词
Multi-item production; Make-to-stock; Make-to-order; First-in-first-out; Polling system; MAKE-TO-ORDER; STOCK; POLICIES; TIMES;
D O I
10.1007/s00170-010-2984-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Suppliers produce a variety of products to serve both large and small customer orders with unreliable demand information. Furthermore, suppliers also face customer pressure to improve quality, lower cost, and reduce delivery delay. These conflicting objectives lead firms to use both make-to-stock and make-to-order production strategies together. These manufacturing strategies were known to be competing policies and in some cases the choice depends on characteristics of the product. In this study, the firms that manufactured multiple-item types are considered to be free to choose either production policy for each product type (no product-specific requirements are present). Then, using the order-arrival characteristics and cost parameters for each product type, the firm wants to decide which production/scheduling policy to use for each product type. Two production policy (MTS vs MTO) and two scheduling strategy (FIFO vs cyclic) are considered in this study. The analysis and numerical study show that there is no dominant strategy neither for production policy, nor product scheduling policy.
引用
收藏
页码:1179 / 1186
页数:8
相关论文
共 25 条
[1]   Combining make to order and make to stock [J].
Adan, IJBF ;
van der Wal, J .
OR SPEKTRUM, 1998, 20 (02) :73-81
[2]   Make-to-order versus make-to-stock in a production-inventory system with general production times [J].
Arreola-Risa, A ;
DeCroix, GA .
IIE TRANSACTIONS, 1998, 30 (08) :705-713
[3]   Optimal admission control and sequencing in a make-to-stock/make-to-order production system [J].
Carr, S ;
Duenyas, I .
OPERATIONS RESEARCH, 2000, 48 (05) :709-720
[4]  
Carr S.A., 1993, EXACT ANAL PRODUCTIO
[5]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[6]   The impact of adding a make-to-order item to a make-to-stock production system [J].
Federgruen, A ;
Katalan, Z .
MANAGEMENT SCIENCE, 1999, 45 (07) :980-994
[7]   STOCHASTIC DECOMPOSITIONS IN THE M/G/1 QUEUE WITH GENERALIZED VACATIONS [J].
FUHRMANN, SW ;
COOPER, RB .
OPERATIONS RESEARCH, 1985, 33 (05) :1117-1129
[8]  
GUNALAY Y, 1996, THESIS MCMASTER U ON
[9]   Scheduling and reliable lead-time quotation for orders with availability intervals and lead-time sensitive revenues [J].
Keskinocak, P ;
Ravi, R ;
Tayur, S .
MANAGEMENT SCIENCE, 2001, 47 (02) :264-279
[10]  
Nguyen V., 1998, Operations Research, V46, pS13, DOI 10.1287/opre.46.3.S13