Current status of factors leading to team performance of on-site construction professionals in Alberta building construction projects

被引:14
作者
Hewage, Kasun N. [1 ]
Gannoruwa, Anupama [2 ]
Ruwanpura, Janaka Y. [3 ]
机构
[1] Univ British Columbia Okanagan, Sch Engn, Kelowna, BC V1V 1V7, Canada
[2] SNC Lavalin T&D, Calgary, AB T2P 3G9, Canada
[3] Univ Calgary, Dept Civil Engn, Schulich Sch Engn, Calgary, AB T2N 1N4, Canada
关键词
worker skills; supervisory skills; construction productivity; team spirit; worker education; PRODUCTIVITY;
D O I
10.1139/L11-038
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A skill-measuring criterion or strategy can be used to optimize the scarce skilled labour force in the Canadian construction industry. The University of Calgary conducted an extensive study to assess the skill levels and team performance of field workers and managers in Alberta's building construction projects. Over 150 workers and field managers were interviewed, surveyed with questionnaires and observed, to identify team efficiencies, skill levels, team spirit, and team perceptions of supervision. The average construction worker had over 15 years of field experience. Most of the workers were high school educated. More than 70% of the workers wanted to improve their career skills; however, internal and external opportunities were limited and (or) not promoted by the respective construction companies. A very few foremen had certified skills in administration, computer handling, planning, job management and work records. The research clearly noted the urgent need for training programs, for workers and field managers, to improve their present skill levels.
引用
收藏
页码:679 / 689
页数:11
相关论文
共 27 条
[1]   Physiological demands during construction work [J].
Abdelhamid, TS ;
Everett, JG .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (05) :427-437
[2]   US construction labor productivity trends, 1970-1998 [J].
Allmon, E ;
Haas, CT ;
Borcherding, JD ;
Goodrum, PM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02) :97-104
[3]  
BORCHERDING JD, 1977, J CONSTRUCT DIV-ASCE, V103, P71
[4]  
BORCHERDING JD, 2001, 20 CTR CONSTR IND ST
[5]   Strategic management of human resources in construction [J].
Brandenburg, SG ;
Haas, CT ;
Byrom, K .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2006, 22 (02) :89-96
[6]  
Burleson R. C., 1997, THESIS U TEXAS AUSTI
[7]  
*BUSS ROUND TABL, 1982, ABS TURN
[8]  
*BUSS ROUND TABLE, 1982, FIRST 2 LEV SUP TRAI
[9]  
*CTR CONSTR IND ST, 1999, 4 U TEX AUST
[10]   VERTICAL DYAD LINKAGE APPROACH TO LEADERSHIP WITHIN FORMAL ORGANIZATIONS - LONGITUDINAL INVESTIGATION OF ROLE MAKING PROCESS [J].
DANSEREAU, F ;
GRAEN, G ;
HAGA, WJ .
ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1975, 13 (01) :46-78