Ship routing and scheduling with cargo coupling and synchronization constraints

被引:32
作者
Andersson, Henrik [1 ]
Duesund, Jon M. [1 ]
Fagerholt, Kjetil [1 ,2 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Ind Econ & Technol Management, NO-7491 Trondheim, Norway
[2] Norwegian Marine Technol Res Inst MARINTEK, NO-7450 Trondheim, Norway
关键词
Ship routing and scheduling; Synchronization; Path-flow;
D O I
10.1016/j.cie.2011.07.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The purpose of this paper is to introduce and solve a planning problem faced by shipping companies operating in a special segment of tramp shipping called project shipping. Project shipping differs from other more traditional tramp segments because the cargoes are more unique and usually transported on a one-time basis. The special nature of the cargoes complicates the routing and scheduling. For instance, a cargo can be part of a process facility, but the shipping company cannot transport it unless other parts of the same facility are transported as well, even though these parts may have different origins. This creates an additional coupling constraint between the cargoes. In addition, the different parts might require synchronized delivery within some time window. We present a mathematical formulation for the problem and propose three alternative solution methods based on path flow formulations and a priori column generation. In one of the solution methods this is combined with a scheme for relaxing the complicating synchronization constraints and reintroducing them dynamically when needed. Computational results show that we are able to find optimal solutions to problems based on data obtained from a shipping company. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1107 / 1116
页数:10
相关论文
共 16 条
[1]  
Bredstrom D., 2007, SSRN ELIBRARY, V22
[2]   Ship routing and scheduling with flexible cargo sizes [J].
Bronmo, G. ;
Christiansen, M. ;
Nygreen, B. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (09) :1167-1177
[3]   Column generation approaches to ship scheduling with flexible cargo sizes [J].
Bronmo, Geir ;
Nygreen, Bjorn ;
Lysgaard, Jens .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (01) :139-150
[4]   Ship routing and scheduling: Status and perspectives [J].
Christiansen, M ;
Fagerholt, K ;
Ronen, D .
TRANSPORTATION SCIENCE, 2004, 38 (01) :1-18
[5]  
Christiansen M, 2007, HBK OPERAT RES MANAG, V14, P189, DOI 10.1016/S0927-0507(06)14004-9
[6]  
Desrosiers Jacques., 1995, Handbooks in Operations Research and Management Science, V8, P35, DOI DOI 10.1016/S0927-0507(05)80106-9
[7]  
Dohn A., 2009, VEHICLE ROUTING PROB, P26
[8]   The manpower allocation problem with time windows and job-teaming constraints: A branch-and-price approach [J].
Dohn, Anders ;
Kolind, Esben ;
Clausen, Jens .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) :1145-1157
[9]  
Fagerholt K., 2007, Maritime Economics Logistics, V9, P214
[10]   Routing and scheduling in a liquefied natural gas shipping problem with inventory and berth constraints [J].
Halvorsen-Weare, Elin E. ;
Fagerholt, Kjetil .
ANNALS OF OPERATIONS RESEARCH, 2013, 203 (01) :167-186