Determination and Optimization of the Maintenance Frequencies in the Overhead Contact Line System

被引:7
|
作者
Zorita, A. L. [1 ]
Duque, O. [1 ]
Fernandez, M. A. [2 ]
Garcia-Escudero, L. A. [2 ]
机构
[1] Univ Valladolid, Dept Ingn Elect, E-47011 Valladolid, Spain
[2] Univ Valladolid, Dept Estadist & Invest Operat, E-47011 Valladolid, Spain
关键词
Maintenance; Electric power supply; Rail transportation; Inspection; TECHNOLOGIES; INSPECTION;
D O I
10.1061/(ASCE)TE.1943-5436.0000166
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a methodology to determine the optimum maintenance frequencies for the components of an electric railway overhead contact line system. This methodology is aimed at improving the reliability and availability of each component within its operational context and calculates the maintenance frequencies according to the criticality of each component, the importance of the area in which they are installed, and the component performance. The available maintenance team resources are also taken into account in order to optimize the frequencies and make them feasible for the maintenance team. The proposed methodology uses statistical and optimization tools to take advantage of the information obtained through the careful analysis of the historical data related to the system performance, which allows an objective determination of appropriate maintenance frequencies. Furthermore, it allows establishing the frequencies in a dynamic way through a feedback process. To prove the usefulness of the proposed methodology, a case study is presented in which maintenance frequencies of some components of the overhead contact line of the Spanish railway network are determined.
引用
收藏
页码:964 / 972
页数:9
相关论文
共 50 条
  • [21] MAINTENANCE OPTIMIZATION: FINDING THE BEST FREQUENCIES OF MAINTENANCE ACTIVITIES
    Cluever, Joseph
    Esselman, Thomas
    Bruck, Paul
    PROCEEDINGS OF THE ASME 2020 PRESSURE VESSELS & PIPING CONFERENCE (PVP2020), VOL 8, 2020,
  • [22] Determination of Capacitive Couplings between Multiwire Overhead Contact System and Adjacent Lines
    Semenov, Yuriy
    Bodrov, Pavel
    Popova, Natalia
    2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, APPLICATIONS AND MANUFACTURING (ICIEAM), 2019,
  • [23] Overhead Line Preventive Maintenance Strategy Based on Condition Monitoring and System Reliability Assessment
    Zhang, Dabo
    Li, Wenyuan
    Xiong, Xiaofu
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (04) : 1839 - 1846
  • [24] Diesel Railroad Vehicle for the Maintenance of the Overhead Line of the State Railroad System in Taiwan.
    Grimrath, Hermann
    eb - Elektrische Bahnen, 1980, 78 (04): : 100 - 103
  • [25] Overhead Contact System On-line Monitor Technology Based on Wireless Sensor Network
    Xie, Jiangjian
    Wang, Yi
    Lu, Tingting
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [26] Foundations for Towers of Overhead Contact System
    Trinkaus, Helmut
    eb - Elektrische Bahnen, 1988, 86 (12): : 380 - 384
  • [27] Overhead contact system for speed up
    Shimizu, Masatoshi
    Hayasaka, Takamasa
    Japanese Railway Engineering, 2014, (184): : 10 - 12
  • [28] Overhead contact line design of the Lötschberg basetunnel
    Hahn, Gunter
    eb - Elektrische Bahnen, 2007, 105 (4-5): : 284 - 289
  • [29] Device for overhead contact line height and stagger measurement
    Hargas, Libor
    Sindler, Peter
    Zaborsky, L'ubomir
    2011 INTERNATIONAL CONFERENCE ON APPLIED ELECTRONICS (AE), 2011,
  • [30] Procedure for interactive designing of overhead contact line installations
    Puschmnann
    Burkert, W.
    Elektrische Bahnen, 1995, 93 (03):