Study on crack formation and propagation in the galleries of the Dagangshan high arch dam in Southwest China based on microseismic monitoring and numerical simulation

被引:36
|
作者
Zhuang, Duanyang [1 ]
Ma, Ke [1 ]
Tang, Chunan [1 ]
Cui, Xin [1 ]
Yang, Guiqian [2 ]
机构
[1] Dalian Univ Technol, State Key Lab Coastal & Offshore Engn, Dalian 116024, Liaoning, Peoples R China
[2] Beijing Engn Co Ltd, Power China, Beijing 100024, Peoples R China
基金
中国国家自然科学基金;
关键词
High arch dams; Microseismic monitoring; Numerical simulation; Crack formation and propagation; GEOMECHANICAL MODEL TEST; CONCRETE GRAVITY DAMS; STABILITY ANALYSIS; SEISMIC CRACKING; SAFETY; REINFORCEMENT; STRESS; BEHAVIOR; SLOPE; MINE;
D O I
10.1016/j.ijrmms.2018.11.016
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Dagangshan high arch dam, located in the area with complicated geological conditions and extremely high seismic intensity in Southwest China, has received substantial attention worldwide. Before the impoundment of the reservoir, continuous deep transverse cracks were observed in the low-elevation galleries of the arch dam. To investigate crack formation and propagation in the galleries of the high arch dam, microseismic monitoring and 3D finite element analysis of the galleries were performed during the filling process. The microseismic monitoring system was installed in the foundation gallery and the drainage gallery to detect microcracks around the galleries of the arch dam. The background stress field for crack formation and propagation in the galleries was studied based on 3D finite element modelling. The results indicate that the self-weight of high arch dam produces excessive circumferential tensile stresses at the arch crown of the galleries near the dam heel before impoundment, which is the cause of crack formation in the galleries of the Dagangshan high arch dam. As the impounded water level rises, the tensile stresses and the microseismicity in the galleries near the arch dam heel transfer to the galleries close to the arch dam toe, and the cracks in the galleries near the dam heel would not propagate further but be closed. However, cracking may occur in the gallery close to the dam toe if its micro-seismicity continues increasing. The conclusions have significant implications for reinforcement and operation of the galleries in similar high concrete arch dams.
引用
收藏
页码:157 / 172
页数:16
相关论文
共 22 条
  • [1] Numerical simulation of the formation and propagation of landslide-induced waves: A case study of the RM dam reservoir (Southwest China)
    Wang, Rubin
    Wang, Yunzi
    Xu, Weiya
    Zhan, Zhenggang
    Wang, Huanling
    Xie, Wei-Chau
    Yan, Long
    LANDSLIDES, 2025,
  • [2] Integrated Analysis of the Formation Mechanism of Cracks in a Concrete Dam Using Microseismic Monitoring and Numerical Simulation
    He, Gang
    Li, Biao
    Wang, Xuben
    Xu, Nuwen
    JOURNAL OF SENSORS, 2016, 2016
  • [3] The early warning method of Dagangshan high-arch dam risk based on the time series prediction of the multivariate monitoring data
    Ma, Ke
    Yuan, Zhaohu
    Gao, Zhiliang
    Ren, Fuqiang
    Ke, Hu
    STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2024,
  • [4] Overall stability analysis of a high arch dam based on physical modeling and numerical simulation
    Yang, Bao-quan
    Guo, Xu-yuan
    Zhang, Lin
    Jiao, Xiang
    Chen, Yuan
    Chen, Jian-ye
    Dong, Jianhua
    DEEP ROCK MECHANICS: FROM RESEARCH TO ENGINEERING, 2019, : 157 - 170
  • [5] Experimental study and numerical simulation for seismic failure of high arch dam on shaking table
    Fan, Shuli
    Chen, Jianyun
    Wang, Jianyong
    Zhong, Hong
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (03): : 467 - 474
  • [6] Investigation of temperature rise after arch closure based on monitoring and numerical analysis: A case study of Baihetan arch dam
    Wang, Yifan
    Tang, Xuejuan
    Tan, Yaosheng
    Zhou, Mengxia
    Ouyang, Jianshu
    Liu, Xuecong
    Shang, Chao
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2024, 20
  • [7] Microcrack evolution and local stress inversion at the bottom of a high arch dam during operations across a major earthquake based on microseismic monitoring
    Wang, Longjiang
    Ma, Ke
    Liao, Zhiyi
    Liu, Hongyuan
    Gao, Zhiliang
    Wang, Kaikai
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2025, 189
  • [8] Study on Influence of Numerical Simulation Accuracy on High Core Wall Rockfill Dam Deformation and Crack Analysis
    Zhou, Xiongxiong
    Wu, Bo
    Li, Li
    BUILDINGS, 2022, 12 (10)
  • [9] Study on Rules of Fault Stress Variation Based on Microseismic Monitoring and Numerical Simulation at the Working Face in the Dongjiahe Coal Mine
    Ma, Ke
    Yuan, Fuzhen
    Zhuang, Duanyang
    Li, Quansheng
    Wang, Zhenwei
    SHOCK AND VIBRATION, 2019, 2019
  • [10] A study on rock mass crack propagation and coalescence simulation based on improved numerical manifold method (NMM)
    Zhang, Zishan
    Wang, Shuhong
    Wang, Cungen
    Wang, Pengyu
    GEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCES, 2021, 7 (01)