Application of multi-stage scheduling

被引:0
|
作者
Bongers, Peter M. M. [1 ]
Bakker, B. H. [1 ]
机构
[1] Unilever Food & Hlth Res Inst, NL-3133 AT Vlaardingen, Netherlands
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
A simplified food factory model has been derived from a medium size ice cream manufacturing plant. This is done by building a multi-stage scheduling model which describes the infra-structure of the factory, which products are being produced and how the plant is operated. Key has been to translate complexity of the plant (and the operations) into a simplified, but realistic, multi-stage scheduling model. This model has been implemented in commercial available software. The production schedule could not be derived automatically, but needed manual intervention. Scheduling the factory as a whole, the available overall capacity of the factory can be increased significantly. The integrated factory schedule squeezes 10-30% additional capacity out of the factory.
引用
收藏
页码:1917 / 1922
页数:6
相关论文
共 50 条