共 12 条
[1]
Domaschke J, 1998, 1998 WINTER SIMULATION CONFERENCE PROCEEDINGS, VOLS 1 AND 2, P985, DOI 10.1109/WSC.1998.745803
[2]
GOLDRATT EM, 1986, GOAL
[3]
HOPP WJ, 2000, FACTORY PHYSICS FDN
[4]
LAW AM, 1991, SIMULATION MODELING, P298
[6]
Creating a flexible, simulation-based finite scheduling tool
[J].
PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE,
1997,
:853-860
[7]
Efficient simulation/optimization of dispatching priority with "fake" processing time
[J].
PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE,
1997,
:872-879
[8]
POTORADI J, 1999, P 1999 WINT SIM C, P720
[9]
Rose O, 1998, 1998 WINTER SIMULATION CONFERENCE PROCEEDINGS, VOLS 1 AND 2, P997, DOI 10.1109/WSC.1998.745805
[10]
Sivakumar A. I., 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. `Simulation - A Bridge to the Future' (Cat. No.99CH37038), P727, DOI 10.1109/WSC.1999.823204