Risk allocation in public construction projects: the case of Jordan

被引:26
作者
Hiyassat, Mohammed A. [1 ]
Alkasagi, Fatima [1 ]
El-Mashaleh, Mohammad [2 ]
Sweis, Ghaleb J. [1 ]
机构
[1] Univ Jordan, Civil Engn Dept, Amman, Jordan
[2] Hashemite Univ, Civil Engn Dept, Amman, Jordan
关键词
Risk factors; risk allocation; construction project; public projects; Jordan; MANAGEMENT;
D O I
10.1080/15623599.2020.1728605
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Proper risk identification, assessment, and allocation can reduce cost and time delay. This study identifies, assesses and allocates risks in public construction projects in Jordan with the goal of reducing the overall costly claims and disputes. Based on extensive literature review, the study identifies 62 risk factors that are grouped under 14 categories. The respondents were asked to estimate the probability, impact and proper allocation of these risk factors. Based on 208 valid responses, the results indicate that the top ranked risk factors are delays in client's payments, poorly tailored contract forms, competition, delay in approval of permits, default by subcontractors, unclear specifications, material prices fluctuations, different construction standards, change in design, and poor design. The respondents of the study recommend 4 risk factors to be shouldered by owners, five risk factors to be shouldered by contractors, and 42 risk factors to be shared by the contracting parties. The results of the study also help practitioners to allocate risks to the stakeholder who is more capable to assesses, controls and manages these risks. The generated risk priority can be used to prioritize the risks for response planning.
引用
收藏
页码:1478 / 1488
页数:11
相关论文
共 46 条
[1]  
Abd El-Karim Mohamed Sayed Bassiony Ahmed, 2017, HBRC Journal, V13, P202, DOI 10.1016/j.hbrcj.2015.05.001
[2]  
Alkhamali K, 2014, THESIS
[3]  
Alsalman A., 2012, DISSERTATION
[4]  
[Anonymous], PROJ MAN BOD KNOWL P
[5]  
ARCADIS, 2016, DES CONS NAT BUILT A
[6]  
Banaitiene N., 2012, Risk Management-Current Issues and Challenges, P429, DOI [10.5772/51460, DOI 10.5772/51460]
[7]   Risk management model for international construction joint ventures [J].
Bing, L ;
Tiong, RLK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (05) :377-384
[8]  
Bu-Qammaz AS, 2015, THESIS
[9]  
Bult Adam K., 2016, Construction Contract Claims, Changes and Dispute Resolution. Third Edition, P347
[10]  
Central Bank of Jordan, 2018, ANN REP 2017