Proposing a new function for evaluation of the financial risk of construction projects using Monte Carlo method: Application on Iranian construction industry

被引:12
作者
Ildarabadi, Pouria [1 ]
Alamatian, Javad [2 ]
机构
[1] Islamic Azad Univ, Civil Engn Dept, Taft Branch, Taft, Iran
[2] Islamic Azad Univ, Civil Engn Dept, Mashhad Branch, Mashhad, Razavi Khorasan, Iran
来源
JOURNAL OF BUILDING ENGINEERING | 2021年 / 43卷
关键词
Financial risk; Construction projects; Monte Carlo simulation; TIME; MANAGEMENT; ALLOCATION; MODELS; CBO;
D O I
10.1016/j.jobe.2021.103143
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, the financial risk of construction projects is investigated. This process is carried out by proposing a new function based on three design variables, i.e. Cost List (CL), Material Cost (MC) and Final estimation Cost (FC). Deviations of these parameters are evaluated in ten years period, from 2004 to 2014. In the next step, distribution function and their relative parameters (mean and standard deviation) are determined. The efficiency of the proposed function is verified using the Monte Carlo simulation approach. The proposed simulation process has an ability to evaluate the economic conditions of construction projects. Moreover, the suggested procedure helps to evaluate the financial risk with suitable accuracy.
引用
收藏
页数:7
相关论文
共 39 条
  • [1] Developing a Cost Overrun Predictive Model for Complex Systems Development Projects
    Adoko, Moses T.
    Mazzuchi, Thomas A.
    Sarkani, Shahram
    [J]. PROJECT MANAGEMENT JOURNAL, 2015, 46 (06) : 111 - 125
  • [2] Afhsar A., 2007, ASIAN J CIVIL ENG, V8, P113
  • [3] Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization
    Afshar, A.
    Ziaraty, A. Kasaeian
    Kaveh, A.
    Sharifi, F.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) : 668 - 674
  • [4] Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project
    Ahmed, Shafayet
    Arocho, Ingrid
    [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 33
  • [5] Alamatian J., 2013, ASIAN J CIV ENG, V14, P665
  • [6] [Anonymous], 2017, Project Management Body of Knowledge: A Guide to the Project Management Body of Knowledge 6aEdition. Project Management Journal
  • [7] Baber S., 2016, J CONSTRUCT ENG MANA, V143, P1
  • [8] Supply chain risk management - II: A review of operational, financial and integrated approaches
    Bandaly, Dia
    Shanker, Latha
    Kahyaoglu, Yasemin
    Satir, Ahmet
    [J]. RISK MANAGEMENT-AN INTERNATIONAL JOURNAL, 2013, 15 (01): : 1 - 31
  • [9] Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost
    Batselier, Jordy
    Vanhoucke, Mario
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (11)
  • [10] New Approach to Estimating the Standard Deviations of Lognormal Cost Variables in the Monte Carlo Analysis of Construction Risks
    Chang, Chen-Yu
    Ko, Jia-Wen
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (01)