Modelling and an improved NSGA-II algorithm for sustainable manufacturing systems with energy conservation under environmental uncertainties: a case study

被引:7
作者
Ayyoubzadeh, Behnam [1 ]
Ebrahimnejad, Sadoullah [2 ]
Bashiri, Mahdi [3 ]
Baradaran, Vahid [1 ]
Hosseini, Seyed Mohammad Hassan [4 ]
机构
[1] Islamic Azad Univ, North Tehran Branch, Fac Engn, Ind Engn Dept, Tehran, Iran
[2] Islamic Azad Univ, Karaj Branch, Dept Ind Engn, Karaj, Iran
[3] Coventry Univ, Fac Business & Law, Sch Strategy & Leadership, Coventry, W Midlands, England
[4] Shahrood Univ Technol, Ind Engn & Management Dept, Shahrood, Iran
关键词
Flexible job shop; reactive scheduling; energy-saving; floating scheduling operator; soft time-windows; FLEXIBLE JOB-SHOP; MULTIOBJECTIVE GENETIC ALGORITHM; SCHEDULING PROBLEM; FLOW-SHOP; TOTAL TARDINESS; SUPPLY CHAINS; OPTIMIZATION; HYBRID; CONSUMPTION; TRANSPORTATION;
D O I
10.1080/19397038.2021.1923083
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This study addresses a flexible job shop scheduling problem considering the energy tax regulations. We introduce two strategies as reactive scheduling to deal with two different kinds of uncertainty. The first uncertainty is about the start and processing times of the jobs with a known probability distribution. The second kind is related to machine breakdowns, modification or cancellation of the orders, and receive new orders without any known probability distribution. Two conflict objective functions are considered as minimising tax cost on surplus energy consumption and minimising total cost of jobs lateness based on soft time-windows. A bi-objective mathematical model is developed to formulate the problem. Since the problem is well-known strongly NP-hard, a new solution approach is introduced based on the NSGA-II algorithm to solve the problem in a reasonable computational time. Some test problems based on a real case study are used to evaluate the performance of the proposed solution approach. The result analysis confirms the effectiveness of the proposed algorithm and its superiority comparing with another algorithm based on the classic NSGA-II. Moreover, sensitivity analysis is done on the main parameters to provide proper managerial suggestions based on the obtained Pareto front solutions.
引用
收藏
页码:255 / 279
页数:25
相关论文
共 53 条
[1]   Multi-objective scheduling of dynamic job shop using variable neighborhood search [J].
Adibi, M. A. ;
Zandieh, M. ;
Amiri, M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (01) :282-287
[2]   Hypervolume-based multiobjective optimization: Theoretical foundations and practical implications [J].
Auger, Anne ;
Bader, Johannes ;
Brockhoff, Dimo ;
Zitzler, Eckart .
THEORETICAL COMPUTER SCIENCE, 2012, 425 :75-103
[3]   A new mathematical model towards the integration of cell formation with operator assignment and inter-cell layout problems in a dynamic environment [J].
Bagheri, Masoud ;
Bashiri, Mahdi .
APPLIED MATHEMATICAL MODELLING, 2014, 38 (04) :1237-1254
[4]   Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops [J].
Bruzzone, A. A. G. ;
Anghinolfi, D. ;
Paolucci, M. ;
Tonelli, F. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2012, 61 (01) :459-462
[5]   Determinants of intention and behavior of low carbon commuting through bicycle-sharing in China [J].
Cai, Sijia ;
Long, Xingle ;
Li, Liang ;
Liang, Hui ;
Wang, Qinglin ;
Ding, Xiping .
JOURNAL OF CLEANER PRODUCTION, 2019, 212 :602-609
[6]   Energy-efficient bi-objective single-machine scheduling with power-down mechanism [J].
Che, Ada ;
Wu, Xueqi ;
Peng, Jing ;
Yan, Pengyu .
COMPUTERS & OPERATIONS RESEARCH, 2017, 85 :172-183
[7]  
Che A, 2015, IEEE INT C NETW SENS, P146, DOI 10.1109/ICNSC.2015.7116025
[8]   A collaborative optimization algorithm for energy-efficient multi-objective distributed no-idle flow-shop scheduling [J].
Chen, Jing-fang ;
Wang, Ling ;
Peng, Zhi-ping .
SWARM AND EVOLUTIONARY COMPUTATION, 2019, 50
[9]   An Improved Model for Parallel Machine Scheduling Under Time-of-Use Electricity Price [J].
Cheng, Junheng ;
Chu, Feng ;
Zhou, Mengchu .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (02) :896-899
[10]   Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs [J].
Cheng, Junheng ;
Chu, Feng ;
Liu, Ming ;
Wu, Peng ;
Xia, Weili .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 :721-734