Time-cost relationships in Australian building construction projects

被引:68
作者
Love, PED [1 ]
Tse, RYC
Edwards, DJ
机构
[1] Edith Cowan Univ, Fac Business & Publ Management, Sch Management Informat Syst, We B Ctr, Perth, WA 6027, Australia
[2] Hong Kong Inst Real Estate, Hong Kong, Hong Kong, Peoples R China
[3] Loughborough Univ Technol, OPERC, Dep Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
Australia; Construction industry; Costs; Project management; Time factors: Least-squares method;
D O I
10.1061/(ASCE)0733-9364(2005)131:2(187)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project time-cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the Multiple regression technique of weighted least squares. The ana-lysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of Lime performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are, also presented.
引用
收藏
页码:187 / 194
页数:8
相关论文
共 27 条
  • [1] Alreck P.L., 1985, SURVEY RES HDB
  • [2] BRESNEN MJ, 1988, 42 CHART I BUILD
  • [3] Bromilow F.J., 1980, BUILDING EC, V19, P79
  • [4] Bromilow F. J., 1988, TIME COST PERFORMANC
  • [5] Bromilow F. J., 1969, BUILDING FORUM, V1, P70
  • [6] CHAN APC, 1994, P NAT CONSTR MAN C U, P383
  • [7] CHAN APC, 1996, THESIS U S AUSTR S A
  • [8] Chan D.K.O., 1998, THESIS U HONG KONG H
  • [9] CIDA - Construction Industry Development Agency, 1993, REP TIM COST PERF AU
  • [10] *CIOB, 1987, COD EST PRACT REF S, V1