A unified model for the implementation of both CMMI and 6σ

被引:6
作者
Li, Tzu-Su [1 ]
Lin, L. C. [2 ]
机构
[1] Takming Univ Sci & Technol, Grad Inst Global Trade & Logist Management, Taipei, Taiwan
[2] Natl Kaohsiung First Univ Sci & Technol, Dept Logist Management, Kaohsiung, Taiwan
关键词
continual improvement; capability maturity model integration; 6 sigma approach; process-based management; CONTINUOUS IMPROVEMENT; MATURITY;
D O I
10.1080/14783363.2010.532318
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
During recent years, the major driving forces of customer preference, vehicle safety, environmental protection, and flat demand for new cars have led to a proliferation of car models and associated price reduction in the auto supply chain. To react to the complex and competitive environment, auto suppliers feed the urgent need to conduct continual improvement (CI) in an effective and systematic way. Thus, this paper presents a framework for CI. The integrated development system is proposed to integrate both capability maturity model integration and the 6 sigma approach. By implementing the framework, an automaker can establish a solid process-based management system, identify critical processes, and optimise these processes. For demonstrating the application of this framework, a case study is presented; and the result shows that all expected processes performance targets are achieved, which have dramatically improved by 70% compared with the past records. Apparently, the proposed framework would act as a useful reference to improve an organisation's process maturity.
引用
收藏
页码:407 / 424
页数:18
相关论文
共 36 条
[21]   Software process management of top companies in Taiwan: a comparative study [J].
Li, EY ;
Chen, HG ;
Lee, TS .
TOTAL QUALITY MANAGEMENT, 2002, 13 (05) :701-713
[22]  
Lynch D., 2003, ASQ 6 SIGMA FORUM MA, V2, P27
[23]  
Lynch R L., 1995, Measure up: yardsticks for continuous improvement, V2a Edicao
[24]  
*MIN INC, 2000, MIN STAT SOFTW REL 1
[25]  
NANDA V, 2003, ISO90012000
[26]  
Neal J.A., 1995, ACAD MANAGEMENT EXEC, V9, P42
[27]  
PAULK M, 2002, CMUSEI2002TR012
[28]  
Robinson A., 1991, Continuous improvement in operations
[29]  
Saaty TL., 1980, ANAL HIERARCHY PROCE
[30]  
*SCC, 1999, OV SCOR MOD V2 0