An adaptive memory programming framework for the resource-constrained project scheduling problem

被引:7
|
作者
Paraskevopoulos, Dimitris C. [1 ]
Tarantilis, Christos D. [2 ]
Ioannou, George [2 ]
机构
[1] Univ Bath, Sch Management, Bath, Avon, England
[2] Athens Univ Econ & Business, Dept Management Sci & Technol, Athens, Greece
关键词
adaptive memory programming; project scheduling; resource constraints; VEHICLE-ROUTING PROBLEM; GENETIC ALGORITHM; TABU SEARCH; OPTIMIZATION;
D O I
10.1080/00207543.2016.1145814
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Resource-Constrained Project Scheduling Problem (RCPSP) is one of the most intractable combinatorial optimisation problems that combines a set of constraints and objectives met in a vast variety of applications and industries. Its solution raises major theoretical challenges due to its complexity, yet presenting numerous practical dimensions. Adaptive memory programming (AMP) is one of the most successful frameworks for solving hard combinatorial optimisation problems (e.g. vehicle routing and scheduling). Its success stems from the use of learning mechanisms that capture favourable solution elements found in high-quality solutions. This paper challenges the efficiency of AMP for solving the RCPSP, to our knowledge, for the first time in the literature. Computational experiments on well-known benchmark RCPSP instances show that the proposed AMP consistently produces high-quality solutions in reasonable computational times.
引用
收藏
页码:4938 / 4956
页数:19
相关论文
共 50 条
  • [1] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [2] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [3] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    Annals of Operations Research, 2008, 157 : 25 - 36
  • [4] A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    MATHEMATICS OF OPERATIONS RESEARCH, 2022, 47 (04) : 3156 - 3183
  • [5] Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem
    贾艳
    李晋航
    Journal of Donghua University(English Edition), 2015, 32 (01) : 91 - 96
  • [6] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [7] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [8] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [9] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [10] A Hybrid Programming Framework for Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    INTELLIGENT DATA ENGINEERING AND AUTOMATED LEARNING - IDEAL 2015, 2015, 9375 : 300 - 308