共 55 条
[42]
Taylor GW, 2010, LECT NOTES COMPUT SC, V6316, P140, DOI 10.1007/978-3-642-15567-3_11
[44]
Thomas H R., 2000, Journal o f Construction Law and Business, V1, P1, DOI DOI 10.1061/(ASCE)1943-4162(2010)2:2(106
[45]
QUANTITATIVE EFFECTS OF CONSTRUCTION CHANGES ON LABOR PRODUCTIVITY
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1995, 121 (03)
:290-296
[46]
Construction baseline productivity: Theory and practice
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1999, 125 (05)
:295-303
[47]
Scheduled overtime and labor productivity: Quantitative analysis
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (02)
:181-188