Experimental study of control strategy for wind generation system

被引:7
作者
Jia, Yaoqin [1 ]
Wang, Zhaoan [1 ]
Yang, Zhongqing
机构
[1] Xi An Jiao Tong Univ, Coll Elect Engn, Power Elect & Renewable Res Ctr, Xian 710049, Shanxi Province, Peoples R China
来源
2007 IEEE POWER ELECTRONICS SPECIALISTS CONFERENCE, VOLS 1-6 | 2007年
关键词
D O I
10.1109/PESC.2007.4342164
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Due to the uncontrollable natural characteristic of wind speed and the large size of wind turbine, it is very difficult and sometimes impossible to do the experimental study of control strategy for wind generation system in laboratory. In this case a wind turbine simulator is used. This paper presents a method to simulate wind turbine, which includes the calculation method of the torque-speed curve from the rated parameter of actual wind turbine and the implementation of the wind turbine simulator. By using this method, many wind turbines can be simulated easily in the laboratory. Using the proposed wind turbine simulator, an experimental study of control strategy for a 10kW wind generation system is implemented, which confirm the validity of the wind turbine simulation method. A novel maximum power point tracking (MPPT) method with feed forward and feedback control is also represented to improve the efficiency of wind power conversion by using the proposed wind turbine simulator.
引用
收藏
页码:1202 / 1207
页数:6
相关论文
共 11 条
[1]  
ANCA DH, 2004, WIND ENG, V28, P411
[2]   Control of a switched reluctance generator for variable-speed wind energy applications [J].
Cárdenas, R ;
Peña, R ;
Pérez, M ;
Clare, J ;
Asher, G ;
Wheeler, P .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2005, 20 (04) :781-791
[3]   Control of permanent-magnet generators applied to variable-speed wind-energy systems connected to the grid [J].
Chinchilla, M ;
Arnaltes, S ;
Burgos, JC .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2006, 21 (01) :130-135
[4]   Comprehensive control strategy for a variable speed cage machine wind generation unit [J].
Karrari, M ;
Rosehart, W ;
Malik, OP .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2005, 20 (02) :415-423
[5]  
LUCIAN MP, 2004, IEEE T IND APPL, V40, P3
[6]  
MADADI KH, 2004, IEEE T ENERGY CONVER, V19, P547
[7]   Simulation model for wind turbine with asynchronous generator interconnected to the electric network [J].
Mansouri, MN ;
Mimouni, MF ;
Benghanem, B ;
Annabi, M .
RENEWABLE ENERGY, 2004, 29 (03) :421-431
[8]   Sensorless output maximization control for variable-speed wind generation system using IPMSG [J].
Morimoto, S ;
Nakayama, H ;
Sanada, M ;
Takeda, Y .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2005, 41 (01) :60-67
[9]  
SLAVOMIR S, 2006, INT J ENERG RES, V30, P713
[10]  
YAOQIN J, 2004, ACTA ENERGIAE SOLARI, V25, P171