Generation Maintenance Scheduling via Robust Optimization

被引:0
作者
Shabanzadeh, Morteza [1 ]
Fattahi, Mohammad [2 ]
机构
[1] NRI, Elect Power Syst Res Ctr, Dept Power Syst Operat Studies, Tehran 1468617151, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn & Management Syst, Tehran, Iran
来源
2015 23RD IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE) | 2015年
关键词
Generation maintenance; robust optimization; electricity market; maintenance window; outage; uncertainty; CONSTRAINTS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
It is essential to develop versatile decision-making tools for GENCOs by which the most efficient maintenance schedules in highly competitive electricity markets are devised. The key of preventive Generation Maintenance Scheduling (GMS), or Outage Planning, is to determine the optimal time period for which generating units of a GENCO should be taken off-line over the course of a one-year planning horizon. In practice, GMS is mathematically modeled as an optimization problem with a multitude of variables and uncertain parameters which need to be determined for optimal commercial decisions. This context explores a robust optimization-based procedure to evaluate the impact of price uncertainty on GENCOs' profits and their desired maintenance schedules. In contrast with the probabilistic and stochastic methods, the proposed approach is more practical because it only requires an uncertainty interval, rather than a probability distribution of the uncertain data. To demonstrate the tremendous performance of the proposed approach, a GENCO with three generation units is investigated.
引用
收藏
页码:1504 / 1509
页数:6
相关论文
共 10 条
[1]   Robust discrete optimization and network flows [J].
Bertsimas, D ;
Sim, M .
MATHEMATICAL PROGRAMMING, 2003, 98 (1-3) :49-71
[2]   OPTIMAL GENERATING-UNIT MAINTENANCE SCHEDULING FOR MULTIAREA SYSTEM WITH NETWORK CONSTRAINTS [J].
CHEN, L ;
TOYODA, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (03) :1168-1174
[3]   Generation maintenance scheduling in restructured power systems [J].
Conejo, AJ ;
García-Bertrand, R ;
Díaz-Salazar, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :984-992
[4]   Generation maintenance scheduling considering transmission constraints [J].
da Silva, EL ;
Schilling, MT ;
Rafael, MC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :838-843
[5]   A strength Pareto evolutionary algorithm-based conflict assessment framework of electricity market participants' objectives in generation maintenance scheduling [J].
Latify, Mohammad Amin ;
Seifi, Hossein ;
Mashhadi, Habib Rajabi .
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2013, 23 (03) :342-363
[6]   Weekly self-scheduling, forward contracting, and pool involvement for an electricity producer. An adaptive robust optimization approach [J].
Lima, Ricardo M. ;
Novais, Augusto Q. ;
Conejo, Antonio J. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (02) :457-475
[7]  
Shabanzadeh M., 2014, SMART GRID C TEHR IR
[8]  
SHAHIDEHPOUR M., 2000, MAINTENANCE SCHEDULI
[9]  
Wang X., 1994, MODERN POWER SYSTEMS
[10]   GENCO's risk-based maintenance outage scheduling [J].
Wu, Lei ;
Shahidehpour, Mohammad ;
Li, Tao .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (01) :127-136