Considering build-later for major transit investments

被引:7
作者
Chu, XH [1 ]
Polzin, SE [1 ]
机构
[1] Univ S Florida, Ctr Urban Transportat Res, Tampa, FL 33620 USA
关键词
major investment study; build-later; net present value; investment timing; discount rate;
D O I
10.1016/S0965-8564(98)00012-3
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper uses a theoretical model of benefit-cost analysis to consider the timing of major transit investments. The model takes into account the net benefits of a project, the variation of net benefits with project age and investment timing, capital cost and its growth, and the discount rate. Three questions are examined: (1) when might build-later be evaluated? (2) how do changes in the discount rate and other parameters of an investment affect its optimal timing? and (3) how significantly do differences in the stream of net benefits from an investment affect its optimal timing? The first two questions are examined analytically, and the last question is examined numerically. Implications are discussed with respect to planning for major transit investments. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:393 / 405
页数:13
相关论文
共 32 条
[1]   UNCERTAINTY IN THE CONTEXT OF HIGHWAY APPRAISAL [J].
ASHLEY, DJ .
TRANSPORTATION, 1980, 9 (03) :249-267
[2]  
*CUTR, 1995, NEW STRAT URB TRANSP
[3]  
DEEN TB, 1976, TRANSPORTATION RES B, V559, P33
[4]  
Dixit K., 1994, INVESTMENT UNCERTAIN
[5]  
EURITT MA, 1960, TRANSPORTATION RES B, V1266, P152
[6]  
*FHWA, 1996, EXPLORING APL BENEFI
[7]  
*FTA, 1994, REV MEAS ASS MAJ INV
[8]  
GIFFORD JL, 1993, INFRASTRUCTURE PLANN
[9]  
HIRSCHMAN I, 1991, TRANSPORT Q, V45, P43
[10]   EVALUATION METHODS FOR RAIL TRANSIT PROJECTS [J].
JOHNSTON, RA ;
DELUCHI, MA .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1989, 23 (04) :317-325