Applying Moving back-propagation neural network and Moving fuzzy-neuron network to predict the requirement of critical spare parts

被引:17
作者
Chen, Fei-Long [1 ]
Chen, Yun-Chin [1 ]
Kuo, Jun-Yuan [2 ]
机构
[1] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu 30013, Taiwan
[2] Kainan Univ, Dept Int Business, Tao Yuan 33857, Taiwan
关键词
Moving back-propagation neural network; Moving fuzzy-neuron network; Critical spare part; Prediction; STOCKING POLICY; DEMAND; SYSTEM;
D O I
10.1016/j.eswa.2010.04.037
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The critical spare parts (CSP) are vital to machine operation, which also have the characteristic of more expensive, larger demand variation, longer purchasing lead time than non-critical spare parts. Therefore, it is an urgent issue to devise a way to forecast the future requirement of CSP accurately. This investigation proposed Moving back-propagation neural network (MBPN) and Moving fuzzy-neuron network (MFNN) to effectively predict the CSP requirement so as to provide as a reference of spare parts control. This investigation also compare prediction accuracy with other forecasting methods, such as grey prediction method, back-propagation neural network (BPN), fuzzy-neuron networks (FNN). All of the prediction methods evaluated the real data, which are provided by famous wafer testing factories in Taiwan, the effectiveness of the proposed methods is demonstrated through a real case study. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:6695 / 6704
页数:10
相关论文
共 22 条
[1]   Sales forecasting using time series and neural networks [J].
Ansuj, AP ;
Camargo, ME ;
Radharamanan, R ;
Petry, DG .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) :421-424
[2]   Inventory control of spare parts using a Bayesian approach: A case study [J].
Aronis, KP ;
Magou, L ;
Dekker, R ;
Tagaras, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 154 (03) :730-739
[3]   Two-echelon spare parts inventory system subject to a service constraint [J].
Caglar, D ;
Li, CL ;
Simchi-Levi, D .
IIE TRANSACTIONS, 2004, 36 (07) :655-666
[4]   A spare parts stocking policy based on equipment criticality [J].
Dekker, R ;
Kleijn, MJ ;
de Rooij, PJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 56-7 :69-77
[5]  
Deng Julong, 1989, Journal of Grey Systems, V1, P1
[6]  
Fei-Long Chen, 2009, 2009 WRI World Congress on Computer Science and Information Engineering, CSIE, P225, DOI 10.1109/CSIE.2009.774
[7]   Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model [J].
Ghobbar, AA ;
Friend, CH .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (14) :2097-2114
[8]   A hybrid support vector machines and logistic regression approach for forecasting intermittent demand of spare parts [J].
Hua, Zhongsheng ;
Zhang, Bin .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) :1035-1048
[9]   A stocking policy for spare part provisioning under age based preventive replacement [J].
Kabir, ABMZ ;
AlOlayan, AS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (01) :171-181
[10]   Back-propagation learning in improving the accuracy of neural network-based tourism demand forecasting [J].
Law, R .
TOURISM MANAGEMENT, 2000, 21 (04) :331-340