A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem

被引:0
|
作者
Cervantes, Mariamar [1 ,2 ]
Lova, Antonio [3 ]
Tormos, Pilar [3 ]
Barber, Federico [1 ]
机构
[1] DSIC Univ Politecn Valencia, Valencia, Spain
[2] Univ Sabana, Bogota, Colombia
[3] Univ Politecn Valencia, DEIOAC, Valencia, Spain
来源
NEW FRONTIERS IN APPLIED ARTIFICIAL INTELLIGENCE | 2008年 / 5027卷
关键词
project scheduling; resource constraints; genetic algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource Constrained Project Scheduling Problem (RCPSP) is a well known problem that is easy to describe but very difficult to solve, and therefore, it has attracted the attention of many researchers over the last few decades. In this context, heuristics are the only option when solving realistically-sized projects. In this paper we develop a steady-state genetic algorithm that uses a dynamic population and four decoding methods. These features allow the algorithm to adapt itself to the characteristics of the problem. Finally, its performance is compared against the best project scheduling methods published so far. The results show that the proposed scheduling method is one of the best scheduling techniques when compared with results reported in the literature.
引用
收藏
页码:611 / +
页数:2
相关论文
共 50 条
  • [1] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [2] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [3] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [4] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [5] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, (05) : 376 - 382
  • [6] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [7] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [8] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [9] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [10] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,