Optimal Black Start Allocation for Power System Restoration

被引:86
作者
Patsakis, Georgios [1 ,2 ]
Rajan, Deepak [3 ]
Aravena, Ignacio [4 ]
Rios, Jennifer [5 ]
Oren, Shmuel [1 ,2 ]
机构
[1] Univ Calif Berkeley, Dept Ind Engn & Operat Res, Berkeley, CA 94720 USA
[2] Univ Calif Berkeley, Tsinghua Berkeley Shenzhen Inst, Berkeley, CA 94720 USA
[3] Lawrence Livermore Natl Lab, Livermore, CA 94551 USA
[4] UC Louvain, Ctr Operat Res & Econometr, B-1348 Louvain La Neuve, Belgium
[5] Pacific Gas & Elect Co PG&E, San Francisco, CA 94110 USA
关键词
Black start allocation; power system restoration; mixed integer programming; NERC compliance; OPTIMIZATION;
D O I
10.1109/TPWRS.2018.2839610
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. We proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.
引用
收藏
页码:6766 / 6776
页数:11
相关论文
共 38 条
  • [11] Gueret C., 1999, Applications of Optimization with Xpress-MP
  • [12] Optimal Transmission Switching With Contingency Analysis
    Hedman, Kory W.
    O'Neill, Richard P.
    Fisher, Emily Bartholomew
    Oren, Shmuel S.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (03) : 1577 - 1586
  • [13] Computation of Milestones for Decision Support During System Restoration
    Hou, Yunhe
    Liu, Chen-Ching
    Sun, Kai
    Zhang, Pei
    Liu, Shanshan
    Mizumura, Dean
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (03) : 1399 - 1409
  • [14] ISO New England, 2016, SCHED 16 BLACKST STA
  • [15] Blackstart capability planning for power system restoration
    Jiang, Yazhou
    Chen, Sijie
    Liu, Chen-Ching
    Sun, Wei
    Luo, Xiaochuan
    Liu, Shanshan
    Bhatt, Navin
    Uppalapati, Sunitha
    Forcum, David
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2017, 86 : 127 - 137
  • [16] Kafka R., 2008, Power and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE, P1
  • [17] Kiger P. J., 2013, NATL GEOGRAPHIC
  • [18] Lee R. M., 2016, ELECT INF SHARING AN, V388, P1
  • [19] Liu S., 2012, Proceedings of IEEE International Conference on Power System Technology (POWERCON), P1, DOI DOI 10.1109/ISMA.2012.6215162
  • [20] Liu SS, 2014, IEEE POWER ENERGY M, V12, P54, DOI 10.1109/MPE.2013.2285609