TBM Performance Analysis in Pyroclastic Rocks: A Case History of Karaj Water Conveyance Tunnel

被引:165
作者
Hassanpour, J. [1 ]
Rostami, J. [2 ]
Khamehchiyan, Mashalah [1 ]
Bruland, A. [3 ]
Tavakoli, H. R. [4 ]
机构
[1] Tarbiat Modares Univ, Dept Engn Geol, Tehran, Iran
[2] Penn State Univ, Dept Energy & Mineral Engn, University Pk, PA 16802 USA
[3] Norwegian Univ Sci & Technol NTNU, Dept Civil & Transportat Engn, Trondheim, Norway
[4] SCE Co, Tehran, Iran
关键词
Rate of penetration; Field penetration index; TBM performance; Boreability; MASS; PREDICTION;
D O I
10.1007/s00603-009-0060-2
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Karaj Water Conveyance Tunnel (KWCT) is 30-km long and has been designed for transferring 16 m(3)/s of water from Amir-Kabir dam to northwest of Tehran. Lot No. 1 of this long tunnel, with a length of 16 km, is under construction with a double shield TBM and currently about 8.7 km of the tunnel has been excavated/lined. This paper will offer an overview of the project, concentrating on the TBM operation and will review the results of field performance of the machine. In addition to analysis of the available data including geological and geotechnical information and machine operational parameters, actual penetration and advance rates will be compared to the estimated machine performance using prediction models, such as CSM, NTNU and Q(TBM). Also, results of analysis to correlate TBM performance parameters to rock mass characteristics will be discussed. This involves statistical analysis of the available data to develop new empirical methods. The preliminary results of this study revealed that the available prediction models need some corrections or modifications to produce a more accurate prediction in geological conditions of this particular project.
引用
收藏
页码:427 / 445
页数:19
相关论文
共 23 条
  • [1] Barton N., 1974, Rock Mech, V6, P189, DOI DOI 10.1007/BF01239496
  • [2] BARTON N, 2000, TBM TUNNELLING JOINT, P173
  • [3] BARTON N, 1999, QTBM TUNN TUNN INT, V31, P30
  • [4] Bieniawski ZT., 1989, Engineering rock mass classification, P251
  • [5] Bilgin N, 1997, P WORD TUNN C 97 TUN, P455
  • [6] Blindheim OT., 1979, THESIS NORWEGIAN I T, P406
  • [7] Bruland A, 1998, THESIS NORWEGIAN U S, V1-10
  • [8] Cassinelli F., 1982, TUNNELING 82, P73
  • [9] Deere D.U., 1967, PROC 8 US S ROCK MEC, P237
  • [10] Development of a rock mass characteristics model for TBM penetration rate prediction
    Gong, Q. M.
    Zhao, J.
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2009, 46 (01) : 8 - 18