A Multi-Stage Restoration Method for Medium-Voltage Distribution System With DGs

被引:90
作者
Wang, Feng [1 ]
Chen, Chun [1 ]
Li, Canbing [1 ]
Cao, Yijia [1 ]
Li, Yong [1 ]
Zhou, Bin [1 ]
Dong, Xuzhu [2 ]
机构
[1] Hunan Univ, Coll Elect & Informat Engn, Changsha 410082, Hunan, Peoples R China
[2] China Southern Grid, Elect Power Res Inst, Guangzhou 510080, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
Distribution system; distributed generators (DGs); intentional islanding; service restoration; SCALE DISTRIBUTION-SYSTEMS; RADIAL-DISTRIBUTION SYSTEMS; SERVICE RESTORATION; NETWORK RECONFIGURATION; OPTIMIZATION ALGORITHM; SYNCHRONOUS MACHINE; PRIORITY CUSTOMERS; HARMONY SEARCH; PLACEMENT; RELIABILITY;
D O I
10.1109/TSG.2016.2532348
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A fast and effective service restoration method is proposed for medium-voltage distribution system with distributed generators by combining intentional islanding of distributed generators with network reconfiguration to maximize restoration of out-of-service loads. The whole process is divided into four stages: 1) matching islanding schemes; 2) restoration of network connectivity and distributed generators; 3) network reconfiguration; and 4) optimization of load shedding. Whether the last three stages are executed or not depends on violations of operational constraints. In accordance with the topological feature of distribution system, a new concept of fundamental loop matrix is presented and applied in detecting out-of-service areas, restoration of network connectivity, and network reconfiguration. Simulation studies on the PG&E 69-bus system shows the effectiveness of the proposed approach.
引用
收藏
页码:2627 / 2636
页数:10
相关论文
共 37 条
[1]   Distribution Systems Reconfiguration using a modified particle swarm optimization algorithm [J].
Abdelaziz, A. Y. ;
Mohammed, F. M. ;
Mekhamer, S. F. ;
Badr, M. A. L. .
ELECTRIC POWER SYSTEMS RESEARCH, 2009, 79 (11) :1521-1530
[2]  
[Anonymous], 2013, 8142013 DLT
[3]  
[Anonymous], 2005, 52222005 DL
[4]  
[Anonymous], 2009, 3702009 QGDW
[5]   Reliability Evaluation for Distribution System With Renewable Distributed Generation During Islanded Mode of Operation [J].
Atwa, Yasser M. ;
El-Saadany, Ehab F. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (02) :572-581
[6]   OPTIMAL CAPACITOR PLACEMENT ON RADIAL-DISTRIBUTION SYSTEMS [J].
BARAN, ME ;
WU, FF .
IEEE TRANSACTIONS ON POWER DELIVERY, 1989, 4 (01) :725-734
[7]   IEEE 1547 series of standards: Interconnection issues [J].
Basso, TS ;
DeBlasio, R .
IEEE TRANSACTIONS ON POWER ELECTRONICS, 2004, 19 (05) :1159-1162
[8]   Greedy Reconfiguration Algorithms for Medium-Voltage Distribution Networks [J].
Carcamo-Gallardo, Angely ;
Garcia-Santander, Luis ;
Pezoa, Jorge E. .
IEEE TRANSACTIONS ON POWER DELIVERY, 2009, 24 (01) :328-337
[9]   Feasibility study of upgrading primary feeders from radial and open-loop to normally closed-loop arrangement [J].
Chen, TH ;
Huang, WT ;
Gu, JC ;
Pu, GC ;
Hsu, YF ;
Guo, TY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (03) :1308-1316
[10]   Control of hybrid AC/DC microgrid under islanding operational conditions [J].
Ding, Guangqian ;
Gao, Feng ;
Zhang, Song ;
Loh, Poh Chiang ;
Blaabjerg, Frede .
JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2014, 2 (03) :223-232