Power Transmission Network Investment as an Anticipation Problem

被引:14
作者
Rious, Vincent [1 ,2 ]
Perez, Yannick [2 ,3 ]
Glachant, Jean-Michel [2 ,4 ]
机构
[1] Microeconomix, Paris, France
[2] RSCAS EUI, Fiesole, Italy
[3] Univ Paris 11, Paris, France
[4] Florence Sch Regulat, Florence, Italy
关键词
liberalized power system; transmission network; planning; investment; anticipation; RESTRUCTURED ELECTRICITY MARKETS;
D O I
10.2202/1446-9022.1284
中图分类号
F [经济];
学科分类号
02 ;
摘要
Power generation and transmission are complementary activities that must be coordinated to ensure an optimal use and development of the transmission network. This coordination is today more difficult in a liberalized system, because of unbundling and the freedom for investors to choose their generation technologies (Joskow, 2006). Shorter investment time between generation and network create uncertainty for the network planning and congestions. In the economic literature, the efficiency of anticipating generation investment has been under-evaluated assuming that it is a cost free activity. Our model evaluates the effect of anticipation costs and defines in which cases the previous results by Sauma and Oren (2006, 2007) could still hold.
引用
收藏
页数:22
相关论文
共 27 条
[1]  
[Anonymous], COST GEN EL
[2]  
BRATEN J, 2004, EUR TRANSM INV C COP
[3]  
*BRATTL GROUP, 2007, REV TENN CONN POL
[4]  
Brennan TJ, 2009, REV NETW ECON, V8, P279
[5]  
Christiner G., 2007, CEER EL INFR WORKSH
[6]  
*DGEMP, 2003, COUTS REF PROD EL
[7]  
*ETSO, 2007, EUR WIND INT STUD EW
[8]  
European Transmission System Operators (ETSO), 2006, OV ADM PROC CONSTR 1
[9]  
*EWEA, 2005, SUPP SCHEM REN EN CO
[10]  
FERC, 2007, ORD GRANT PET DECL O