Opportunities and challenges of modular methods in dense urban environment

被引:95
作者
Choi, Jin Ouk [1 ]
Chen, Xing Bin [2 ]
Kim, Tae Wan [3 ]
机构
[1] Univ Nevada, Dept Civil & Environm Engn & Construct, Las Vegas, NV 89154 USA
[2] City Univ Hong Kong, Kowloon, Dept Architecture & Civil Engn, Hong Kong, Peoples R China
[3] Incheon Natl Univ, Div Architecture & Urban Design, Incheon, South Korea
关键词
Modularization; prefabrication; off-site construction; urban environments; benefits and barriers; OFF-SITE PRODUCTION; CONSTRUCTION WASTE; PREFABRICATION; OFFSITE;
D O I
10.1080/15623599.2017.1382093
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When properly implemented, modular construction offers considerable opportunity to improve project performance. However, the construction industry continues to struggle to achieve higher levels of modularization. Since the characteristics and environments in dense urban areas differ to those in rural areas, strategy, pre-project planning, project execution planning, and actual execution of modular construction should also differ. However, research so far has not focused on the implementation of modular methods in urban environments. Thus, the aim of this study was to identify unique challenges and opportunities for implementing modular techniques in urban environments. To meet this goal, this paper examined the current practices, benefits, and barriers in highly dense urban areas by employing a three staged-sequential approach involving the preliminary investigation, main survey (106 responses from 39 companies), and ex-post in-depth interviews with 10 experts. The results show that (1) 'better site operations' was selected by practitioners as the greatest benefit, and 'site access and on-site storage area' was selected as the key barrier and (2) the practitioners experienced difficulties in transporting modules in urban areas. These findings offer valuable implications to modular technique implementation in urban areas around the world.
引用
收藏
页码:93 / 105
页数:13
相关论文
共 46 条
[1]  
[Anonymous], 2009, ADV COMP EFF US CONS
[2]  
[Anonymous], 2015, P 2015 MOD OFFS CONS
[3]  
[Anonymous], 2010, IMPR CONSTR EFF PROD
[4]  
[Anonymous], BENCHM METR PROJ LEV
[5]  
[Anonymous], IND MOD 5 SOL EL
[6]   Modelling design information to evaluate pre-fabricated and pre-cast design solutions for reducing construction waste in high rise residential buildings [J].
Baldwin, A. N. ;
Shen, L. Y. ;
Poon, C. S. ;
Austin, S. A. ;
Wong, I. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (03) :333-341
[7]  
Bernstein H.M., 2011, PREFABRICATION MODUL
[8]   Benefit evaluation for off-site production in construction [J].
Blismas, Nick ;
Pasquire, Christine ;
Gibb, Alistair .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (02) :121-130
[9]  
Building Department Hong Kong SAR, 2002, 2 BUILD DEP HONG KON
[10]  
Building Department Hong Kong SAR, 2001, 1 BUILD DEP HONG KON