Evaluating the Influence of Differing Geotechnical Risk Perceptions on Design-Build Highway Projects

被引:12
|
作者
Castro-Nova, I. [1 ]
Gad, G. M. [2 ]
Touran, A. [3 ]
Cetin, B. [4 ]
Gransberg, D. D. [4 ]
机构
[1] Manatts Inc, 6333 NW Beaver Dr, Johnston, IA 50131 USA
[2] Cal Poly Pomona, Dept Civil Engn, Pomona, CA 91768 USA
[3] Northeastern Univ, Dept Civil & Environm Engn, Boston, MA 02115 USA
[4] Iowa State Univ, Dept Civil Construct & Environm Engn, Ames, IA 50014 USA
来源
ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING | 2018年 / 4卷 / 04期
关键词
MANAGEMENT;
D O I
10.1061/AJRUA6.0000993
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Managing geotechnical risk in design-build (DB) projects is complicated because the contract is awarded before a thorough subsurface investigation is conducted, making geotechnical uncertainty high during bid preparation. Typically, owners allocate geotechnical risk between themselves and competing design-builders in the DB project's request of proposals (RFP), and the perceived RFP risk profile is reflected in the bid prices proposed by competing DB teams. The level of perceived geotechnical uncertainty is exacerbated when the RFP's geotechnical content is either inadequate or ambiguous, a condition that may not have been recognized by the RFP's authors. Hence, the purpose of this paper is to understand the influence of differing perceptions on the DB project's pricing. The paper analyzes the difference in perceived DB geotechnical risk for 27 common geotechnical risk factors identified in a survey of state department of transportation (DOT) geotechnical engineers and professionals of the DB industry. Those geotechnical risk factors were rated on the basis of frequency and impact by 46 DOT and industry practitioners, and the results are synthesized using importance index theory. The study finds a statistically significant difference in the perceptions of importance of geotechnical risk factors between public agencies and the DB industry. The average perceived difference in the rated factors is nearly 12%. This paper recommends that the perceptions of geotechnical risk be aligned before the contract award using progressive DB procurement or after the award using a scope validation period to provide an opportunity to share the geotechnical risks. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:11
相关论文
共 10 条
  • [1] Development of quality index for design-build transportation projects
    Adamtey, Simon Asinor
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2019, 14 (02) : 147 - 154
  • [2] Effect of Duration of Design-Build Procurement on Performance of Transportation Projects
    Migliaccio, Giovanni C.
    Bogus, Susan M.
    Chen, Ao
    TRANSPORTATION RESEARCH RECORD, 2010, (2151) : 67 - 73
  • [3] Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects
    Yeganeh, Azadeh A.
    Azizi, Mojtaba
    Falsafi, Reza
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (12)
  • [4] Workflow re-engineering of design-build projects using a BIM tool
    Tsai, Meng-Han
    Md, Abdul Matin
    Kang, Shih-Chung
    Hsieh, Shang-Hsien
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2014, 37 (01) : 88 - 102
  • [5] Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective
    Lee, Zheng Ping
    Rahman, Rahimi A.
    Doh, Shu Ing
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2021, 26 (01) : 131 - 160
  • [6] Critical success factors for implementing design-build: analysing Malaysian public projects
    Lee, Zheng Ping
    Rahman, Rahimi A.
    Doh, Shu Ing
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2022, 20 (05) : 1041 - 1056
  • [7] Strategies and Resources for Government Agencies to Utilize Disadvantaged Business Enterprises in Transportation Design-Build Projects
    Ashuri, Baabak
    Amekudzi-Kennedy, Adjo
    Amoaning-Yankson, Stephanie
    Liang, Yunping
    Cao, Yang
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (04)
  • [8] Application of decision support tool in design-build projects: a quasi-experiment with novice decision makers
    Lee, Zheng Ping
    Rahman, Abdul Rahimi Abdul
    Doh, Shu Ing
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2022, 12 (04) : 537 - 555
  • [9] Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public-Private Partnership Highway Projects
    Antillon, Eric I.
    Garvin, Michael J.
    Molenaar, Keith R.
    Javernick-Will, Amy
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (05)
  • [10] Risk factors that influence adoption of Building Information Modelling (BIM) for refurbishment of complex building projects: stakeholders perceptions
    Okakpu, Anthony
    Ghaffarianhoseini, Ali
    Tookey, John
    Haar, Jarrod
    Ghaffarianhoseini, Amirhosein
    Rehman, Attiq Ur
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (13) : 2446 - 2458